NYC Building Report

Brooklyn Dyker Heights

7802 13 Avenue, Brooklyn

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-06255-0038), so they can include other buildings on the same lot.

7 records

Date Class Status Apartment Summary
Jul 6, 2026 A NOV SENT OUT Not available § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
Sep 3, 2021 A NOV SENT OUT 2RF § 27-2013 ADMIN. CODE: PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL PEELING PAINT SURFACES IN THE 3rd ROOM FROM NORTH AT EAST, THE KITCHENETTE , THE 2nd ROOM FROM NORTH AT WEST, THE 1st ROOM FROM NORTH LOCATED AT APT 2RF, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Sep 3, 2021 B NOV SENT OUT 2RF § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2RF, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Sep 3, 2021 B NOV SENT OUT 2RF § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 3rd ROOM FROM NORTH AT EAST LOCATED AT APT 2RF, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Sep 3, 2021 B NOV SENT OUT 2RF § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE KITCHENETTE LOCATED AT APT 2RF, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Sep 3, 2021 B NOV SENT OUT 2RF § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE CEILING IN THE 2nd ROOM FROM NORTH AT WEST LOCATED AT APT 2RF, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH
Sep 3, 2021 B NOV SENT OUT 2RF § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK AT THE WEST WALL AND THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 2RF, 2nd STORY, 1st APARTMENT FROM EAST AT SOUTH