Brooklyn East New York (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
24 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 20, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | REPAIR OR REPLACE THE DAMAGED SECTION OF PARAPET LOCATED AT THE CORNER OF SHEPHERD AVENUE & GLENMORE AVENUE TO ELIMINATE THE FALLING HAZARD & SAFEGUARD PUBLIC SAFETY. ALL WORK SHOULD BE PERFORMED IN ACCORDANCE W/ APPLICABLE BUILDING CODES & SAFETY REGUALATIONS |
| Jun 19, 2025 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DOB SUMMONS ISSUED FOR STRUCTURE RENDERED NON COMPLIANT DUE TO MOTOR VEHICLE IMPACTING SIDEWALK SHED AT THE CORNER OF EXPOSURES 1 AND 2 DAMAGING 1 SECTION OF THE PARAPET WALL OF THE SIDEWALK SHED. |
| Dec 11, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 11, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 11, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 11, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 11, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 26, 2024 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 5, 2024 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAIKURE TOI MAINTAIN IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION O BSERVED A LARGE SECTION OF EIFS & ETICS DISLOGED AND FELL FROM EXPOSUR E #4 WALLONTO SIDEWALK SHED |
| Oct 4, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 16, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FACADE ELEMENT FAILURE(EIFS).FAILURE TO MAINTAIN FACADE&APPURTENANCES ON 3/2/23 LARGE SECT.OF EIFS SEPARATED FROM BLDG STRUCTURE&FELL ON TO BALCONIES,PARKING AREA&PUB.S/WALKBELOW REASONS YET DETERM.@SEVERAL FL #4,5,6&7@EXP3&ROOF OFPARKINGAREA REMEDY:IMMED.TO RETAIN NYS REG.DESIGN PROF.WITH EIFS EXP.INSPECT&EVAL.100%CAUSE OF FAIL.REG.DESIGN TO REVIEW |
| Mar 14, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAINE BUILDING WITH NO IMMEDIATE REMEDY TO THE REMAINING SECTIONS IN WHICH LARGE PCS FELL FROM THE 7TH, 6TH, 5TH AND 4TH FLOOR BALCONY - STOP WORK ORDER ISSUED WITH ADDITIONAL DOB FOR FAILURE TO MAINTAIN / FAILURE TO PROVIDE MEANS AND METHODS TO IMMEDEATELY REMOVE THE HAZARDOUS CONDITION. |
| Mar 14, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL STOP WORK ORDER FAILURE TO MAINTAIN BUILDING LARGE PIECES OF STYROFOAM CONTINUE TO FALL FROM BUILDING CREATING A HAZARDOUS CONDITION ON PUBLIC STREETS AND SIDEWALK. PROVIDE A MEANS AND METH OF REMOVING THE STYROFOAM TO MAKE JOBSITE AND COMMUNITY SAFE. |
| Mar 6, 2023 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROXIMATELY 320LINEAR FEET OF SIDEWALK SHED ON ALL 4EXPOSURE TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Mar 6, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN FACADE&APPURT.ON 03-02-23 A12'WIDTH.X25'HEIGHT SECT.OF DECORATIVE STYRO FOAM(EFIS)HAD DISLODGED&FELL TO THE S/WALK REMEDY:OWNER TO IMMED.RETAIN SERVICES NYS(PE/RA)WITH EXTERIOR FACADE EXPERINCE TO INSPECT&EVALUTE 100%OF ALL FACADE EXPOSUES&PROVIDE FULL REPORT OF CAUSE.OF FAILURE SUBMIT REPORT&DRAWINGS TO FACADE@BLDG DEPT |
| Mar 2, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED A 12'W X 25'H SECTION OF DECRATIVE STYROFOAM HAS DISLODGED ON TO THE SIDEWALK AND REAR PARKING LOT. ALSO PARKING LOT CEILING HAS BEGAN TO PULL AWAY AND IS HANGING. THERE IS THE POTENTIAL FOR FURTHER COLLAPSE.THESE CONDITION ARE HAZARDOUS. |
| Feb 22, 2023 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Dec 1, 2021 | V*-DOB VIOLATION - DISMISSED | EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE | FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3 |
| Nov 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Aug 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jun 2, 2021 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 19, 2021 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| May 6, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK EXCEPT TO MAKE SAFE/CONTACT DOB OFFICE |
| May 6, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK EXCEPT TO MAKE SITE SAFE CONTACT DOB OFFICE |