4 records

Date Status Type Summary
Mar 28, 2019 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG IN SAFE COND ON 3/27/19 A VEHICLE STRUCK EXP1 WALL NEAR EXP 1/4 CORNER CAUSING DMG WALL AND OTHER ISSUES ORDERED TO BE DEMO/BRACED UNDER EMG WRK ORDER DATED 3/28/19 AREA OF DEMO WALL TO BE SEALED WITH TEMP WALL PER OWNER REPLACE TEMP WALL WITH PERM WALL/PARAPET U/PRMT REPAIR CRACKS IN MASN WALL THRUOUT BLDG U/PRMT ALL WRK COMPL BY 5/1/19
Mar 28, 2019 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMG WRK:ON 3/27/19 A VEHICLE STRUCK EXP1 WALL NEAR EXP1/4 CORNER WALL BUCKLED INWARD W/CRACKS IN MASN PARAPET/AWNING OVER STRUCK AREA LEAN OVER@RISK OF COLLAP INTO PARK LOT ON SAME PROP ADJ LOAD BEAR WALL@EXP4 HAS CRACKS OWN IMMED DEMO&REPLACE PORT OF EXP1 WALL ALONG W/LEAN PARAP ET OVERHEAD BRACE ENTIRE LGTH OF EXP2 PARAPET FILE APP W/IN 2 BUS DAYS
Mar 27, 2019 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL DAMAGE OBERVED TO HAVE BEEN SUSTAINED TO NORTH EAST CORNER WALL DUE TO VEHICLE IMPACT AT 762 SHEFFILED AVENUE. OBSERVED ACTIVE GAS LINE FOR DRYER AROUND THE DAMAGE WALL LOCATION
Apr 6, 2018 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT