Brooklyn East New York-New Lots
762 Sheffield Avenue, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 28, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM BLDG IN SAFE COND ON 3/27/19 A VEHICLE STRUCK EXP1 WALL NEAR EXP 1/4 CORNER CAUSING DMG WALL AND OTHER ISSUES ORDERED TO BE DEMO/BRACED UNDER EMG WRK ORDER DATED 3/28/19 AREA OF DEMO WALL TO BE SEALED WITH TEMP WALL PER OWNER REPLACE TEMP WALL WITH PERM WALL/PARAPET U/PRMT REPAIR CRACKS IN MASN WALL THRUOUT BLDG U/PRMT ALL WRK COMPL BY 5/1/19 |
| Mar 28, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMG WRK:ON 3/27/19 A VEHICLE STRUCK EXP1 WALL NEAR EXP1/4 CORNER WALL BUCKLED INWARD W/CRACKS IN MASN PARAPET/AWNING OVER STRUCK AREA LEAN OVER@RISK OF COLLAP INTO PARK LOT ON SAME PROP ADJ LOAD BEAR WALL@EXP4 HAS CRACKS OWN IMMED DEMO&REPLACE PORT OF EXP1 WALL ALONG W/LEAN PARAP ET OVERHEAD BRACE ENTIRE LGTH OF EXP2 PARAPET FILE APP W/IN 2 BUS DAYS |
| Mar 27, 2019 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | DAMAGE OBERVED TO HAVE BEEN SUSTAINED TO NORTH EAST CORNER WALL DUE TO VEHICLE IMPACT AT 762 SHEFFILED AVENUE. OBSERVED ACTIVE GAS LINE FOR DRYER AROUND THE DAMAGE WALL LOCATION |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |