NYC Building Report

Brooklyn Greenpoint

760 Manhattan Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

9 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Feb 24, 2017 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Oct 1, 2015 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT
May 1, 2013 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Apr 21, 2011 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
May 25, 2010 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL BOROUGH COMMISSIONER ISSUED A 15 DAY LETTER OF INTENT REVOKE APPL#3102 79524 ON 05/14/10./REMEDY; STOP ALL WORK MAKE SITE SAFE CINTACT DOB
Apr 21, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO SAFEG.GUARD ALL PERSONS AND PROPERTY REMEDY: STOP ALL WORK EXCEPT TO MAKE SITE SAFE, REMOVE EXCESSIVE DEBRI S AT 4TH FLR. APT. AND PROVIDE EMERGENCY SHORING AT 4TH FLR
Jan 3, 2008 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jun 5, 2006 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. NOTE- FULL PARTITION WALLS AND FIRE STOPPING ILLEGALLY REMOVE FROM FIRST FLOOR SOUTH SIDE VACANT SPACE BEFORE OBTAINING A PERMIT REMEDY: STOP ALL WORK FORTHWITH. OBTAIN ALL NECESSARY PERMITS AND CALL DOB