Brooklyn Bay Ridge
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-05941-0042), so they can include other buildings on the same lot.
10 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Mar 9, 2020 | B | NOV SENT OUT | 3 | § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING LOCATED AT APT 3, 3rd STORY, 1st APARTMENT FROM SOUTH AT WEST |
| Mar 5, 2004 | B | VIOLATION CLOSED | Not available | § 27-2005 ADMIN. CODE: ABATE THE NUISANCE CONSISTING OF EXPOSED ELECTRIC WIRES AT CEILING LIGHT FIXTURE 2ND ROOM FROM FRONT AND FRONT NORTH ROOM 2ND STORY APT |
| Mar 5, 2004 | B | VIOLATION CLOSED | Not available | § 27-2027 ADMIN. CODE: PROPERLY REPAIR THE BROKEN OR DEFECTIVE PAVING AT ENRANCE DOOR TO |
| Jul 15, 2003 | B | VIOLATION CLOSED | Not available | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEIILING AT BATHROOM 2ND STORY APT |
| Jul 15, 2003 | A | NOT COMPLIED WITH | Not available | § 27-2005 ADMIN. CODE: REFIT ENRANCE DOOR TO NORTH WEST ROOM 2ND STORY APT |
| Sep 4, 2001 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 3 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE FLOOR IN THE BATHROOM LOCATED AT APT 3, 3rd STORY |
| Sep 4, 2001 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 3 | § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE CERAMIC TILE AT SOUTH AND EAST WALLS IN THE BATHROOM LOCATED AT APT 3, 3rd STORY |
| Sep 4, 2001 | B | VIOLATION CLOSED | Not available | § 27-2005 ADMIN. CODE: REPLACE WITH NEW THE BROKEN OR DEFECTIVE LOCK ASSEMBLY ENTRANCE DOOR FROM STREET AT PUBLIC HALL, 1st STORY |
| Sep 4, 2001 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 3 | HMC ADM CODE: § 27-2018.4 ABATE THE NUISANCE CONSISTING OF VERMIN ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 3, 3rd STORY |
| Sep 4, 2001 | B | FIRST NO ACCESS TO RE- INSPECT VIOLATION | 3 | § 27-2005 ADMIN. CODE: REPAIR THE ROOF SO THAT IT WILL NOT LEAK OVER THE CEILING IN THE 1st ROOM FROM NORTH LOCATED AT APT 3, 3rd STORY |