Brooklyn Bensonhurst
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 25, 2025 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | SEAL ALL FIRE DAMAGE ACCESSIBLE OPENINGS, TO SAFEGUARD THE PUBLIC AND PROPERTY |
| Aug 24, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | REQUESTING ENGINEERING REPORT DUE TO FIRE. AT THE THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE,WATER AND SMOKE DAMAGE TO FIRST FLOOR COMMERCIAL SPACE, OBSERVED BADLY CHARRED FLOOR JOIST AT SECOND FLOOR LEVEL POTENTIALLY AFFECTING THE STRUCTURAL STABILITY OF THE STRUCTURE. |
| Aug 24, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON-COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED AT FIRST FLOOR COMMERCIAL SPACE EXTENSIVE FIRE, WATER AND SMOKE DAMAGE. ALSO OBSERVED BADLY CHARRED FLOOR JOIST IN COMMERCIAL SPACE. APARTMENTS ON THE A&B LINE ON THE 2ND & 3RD FLOOR HAS EXTENSIVE FIRE DAMAGE, MISSING FIRE RATING AND MISSING WINDOWS. |
| Oct 14, 2006 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Aug 29, 1995 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1994 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 16, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jun 1, 1993 | V-DOB VIOLATION - ACTIVE | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |