Brooklyn Crown Heights (North)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
14 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED/UNDOCUMENTED ST & FO WORK AT 3 STORY BRICK MASONRY MIXED- USED BUILDING. REMEDY:RETAIN NYS PE & GC TO STABILIZE AND SAFEGUARD BUILDING.COMMENCE STABILIZATION WORK UNDER PERMIT BY 10/30/26 |
| Sep 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED/UNDOCUMENTED ST & FO WORK AT 3 STORY BRICK MASONRY MIXED- USED BUILDING. REMEDY:RETAIN NYS PE TO PERFORM MONTHLY STRUCTURAL STABILITY INSPECTIONS. FIRST REPORT BY 10/15/26 |
| Sep 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED/UNDOCUMENTED ST & FO WORK AT 3 STORY BRICK MASONRY MIXED- USED BUILDING. REMEDY:RETAIN NYS PE & GC TO STABILIZE AND SAFEGUARD BUILDING. COMMENCE STABILIZATION WORK UNDER PERMIT BY 10/30/26 |
| Sep 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | UNPERMITTED/UNDOCUMENTED ST & FO WORK AT 3 STORY BRICK MASONRY MIXED- USED BUILDING.REMEDY:RETAIN NYS PE TO PERFORM MONTHLY STRUCTURAL STABILITY INSPECTIONS. FIRST REPORT BY 10/15/26 |
| Aug 21, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ATOI ON 07/24/26 BADGE #: 2647 OBSERVED AT CELLAR AND FIRST FLOOR, INSTALLED NEW UNPERMITTED, UNDOCUMENTED H BEAMS AND WELDED. JACK POSTS INSTALLED ON THE FIRST FLOOR TO SHORE UP THE EXISTING ROOF. NO PERMIT FOR THIS STRUCTURAL WORK AT THE TIME OF INSPECTION. FULL VACATE |
| Aug 21, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | *** CSE AUDIT ***. ATOI ON 07/24/26, BADGE #: 2647 OBSERVED UNPERMITTED, UNDOCUMENTED STRUCTURAL STEEL BEAMS, H BEAMS INSTALLED AT CELLAR AND 1ST FLOOR. ALSO JACK POSTS INSTALLED TO SHORE UP THE EXISTING ROOF. FIRE STOPPING REMOVED. PSWO ISSUED. |
| Jul 24, 2026 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED AT CELLAR AND FIRST FLOOR, INSTALLED NEW UNPERMITTED, UNDOCUMENTED H BEAMS AND WELDED. JACK POSTS INSTALLED ON THE FIRST FLOOR TO SHORE UP THE EXISTING ROOF. NO PERMIT FOR THIS STRUCTURAL WORK AT THE TIME OF INSPECTION. |
| Jul 24, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | OBSERVED AT CELLAR AND FIRST FLOOR, INSTALLED NEW UNPERMITTED, UNDOCUMENTED H BEAMS AND WELDED. JACK POSTS INSTALLED ON THE FIRST FLOOR TO SHORE UP THE EXISTING ROOF. NO PERMIT FOR THIS STRUCTURAL WORK AT THE TIME OF INSPECTION. COMPROMISING THE STABILITY OF THE BUILDING TO OCCUPY. |
| Sep 23, 2024 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |