Brooklyn Sunset Park (Central)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
13 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 6, 2019 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Jan 26, 2018 | V-DOB VIOLATION - ACTIVE | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Dec 26, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 18, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jul 24, 2014 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| May 17, 2013 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | THIS PVT REPLACES PVT 471109 |
| Jun 9, 2010 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILED TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSPECTION./REMEDY; PROVIDE APPROVED CONSTRUCTION DOCUMENTS, STOP ALL WORK, MAKE SITE SAFE |
| Jan 25, 2010 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | EGNCY-EMERGENCY NONE |
| Jan 22, 2010 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | EMERG. DEC. ISSUED #1430/2010 WAS ISSUED ON 01-22-10 REPAIR/REPLACE DEFECTIVE JOB SITE FENCE AT ABANDONED CONSTRUCTION SITE. HPD COMPLETED THE REMEDIAL WORK WHICH WAS VERIFIED ON 02-20-10 WORK AT SITE HAD RESUMED SUBSEQUENTLY, ALL WORK COMPLETED, SIGNED OFF AND C OF O#30 2333151F WAS ISSUED FOR NEW 5 STORY RES. BLDG |
| Jun 9, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TP PROVIDE APPROVED/ACCEPTED PLANS AT JOBSITE AT TIME OF INSPE CTION. NOTED: FOUNDATION NAILS APPROX. 50% COMPLETE UNDER NB PERMIT #302333151. NO UNDERPINNING PLANS, NO AMENDED PLANS REVIEWED BY SEPEX ENGINEER. ARCH PARTIAL STRUCTURAL PLANS DATED 06/07/07 REMEDY: STOP ALL WORK. PROVIDE PLANS. CALL FOR SEPEX INSPECTIONS |
| Jul 14, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DECUMENTS NOTED: AT EXP 2 CONCRETE RETAINING WALL SUBSTITUTES SHORING SH2 REAR EXP 3-4 SHORIN G OMMITTED SUIT SHEER CUT UPINNING PLAN MISSING TOTAL ELEVATIONS OF AL L ADJOINING PROPOSED STRUCTUALS TO SUPPORT REMEDY: STOP ALL WORK EXCEPT TO BACKFILL CONTACT SEP AMEND PLANS |
| Apr 16, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK FORTHWITH EXCEPT THAT IS REQUIRED TO MAKE SITE SAFE |
| Oct 9, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |