Brooklyn East Flatbush-Erasmus
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jan 15, 2024 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Nov 22, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION. TWO MAIN ENTRANCE DOORS SHIFTED AND DISPLACED DUE TO CAR IMPACT FIRE GUARD REQUESTED TO BE ON DUTY UNTIL REPAIRS ARE COMPLETED |
| Nov 22, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED SECTION OF BRICK VENEER CRACKED AND DISPLACED AT GROUND FLOOR LEVEL. TWO MAIN ENTRANCE DOORS. ONE DOOR FOR ACCESS TO CELLAR. ONE DOOR USED AS MAIN ENTRANCE DOOR TO BUILDING SHIFTED AND DISPLACED. METAL RAIL DAMAGED DUE TO CAR IMPACT |
| Apr 4, 2012 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |