Brooklyn Bedford-Stuyvesant (East)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 29, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | RESIDENCE CONVERTED FROM A LEGAL 2 FAMILY TO 3 FAMILY BY CREATING CLASS A APT AT CELLAR LEVEL. DOB RECORDS INDICATES RESIDENCE AS A 2 FAMILY AND NOW CONVERTED AND OCCUPIED AS A 3 FAMILY BY CREATING CLASS A APT AT CELLAR LEVEL WITH FULL KITCHEN, 3 PC BATHROOM AND 1 SLEEPING QUARTER. |
| Mar 29, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT; WORK NOTED, AT CELLAR LEVEL INSTALLED FULL HEIGHT PARTITION FOR FULL BATHROOM. INSTALLED WATER/ WASTE LINE FOR 3PC BATHS (SINK, TOILET, SHOWER) AND MOB SINK. INSTALLED UNAUTHORIZED GAS LINE FOR GAS STOVE. |
| Sep 7, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 24, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 10, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 10, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 26, 2001 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jun 26, 2001 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |