NYC Building Report

Brooklyn Brighton Beach

706 Ocean View Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Dec 27, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION.THE BLDG SUFFRD FROM FAILURE TO MAINTAIN CONDITION ON THE INTERIOR AND EXP6WALL.EXP4WALL STAIRS BULGE&HAD PRTLLY CLLPSD.THERE WERE HORIZONTL&DIAGNL CRACKS IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 337262(112024FEU31302ZT) TO REPAIR THE BLDG UNDER PERMIT
Nov 20, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BDG IN A SAFE CONDITION.THE BLDG SFFRD FROM FAILURE TO MAINTAIN CONDITION ON THE INTERIOR AND EXP6 WALL.EXP4WALL STAIRS BULGE&HAD PRTLLY CLLPSD.THERE WERE HORIZONTL&DIAGNL CRACKS.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,DTRMINE THE STRCTRL STBILITY &PREPARE/FILE RPAIR DWGS.BLDG TO BE RPAIRED
Oct 7, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.THE BLDG SFFRD FRM FUTURE TO MAINTAIN ON EXP1.THE EXP1 WALL BULGD OUTWRD&WAS UNSTABLE.THE BRCK PIER@EXP1/2CRNR&EXP 1/4 CRNR HAD CRCKD&HAD BULGD OUTWRD,W/SIGNIFICANT CRACK.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343798 (100224FEU31301ZT)TO PERFORM THE EMERGENCY WORK.RVDE TEMP
Oct 2, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.THE BLDG SFFRD FRM FUTURE TO MAONTAIN ON EXP1 WALLBULGD OUTWRD&WAS UNSTABLE.THE BRCK PIER@EXP1/2CRNR& EXP 1/4 CRNR HAD BULGD OUTWRD,W/SIGNIFICANT CRACK.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343798 (100224FEU31301ZT)TO PERFORM THE EMERGENCY WIRK.RVDE TEMP
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT SIDEWALK SHED OVER THE ENTRANCE WAY OF ADJACENT BUILDING AT EXP 2, 708 OCEAN VIEW AVE. SHED TO BE WIDE ENOUGH TO COVER ENTIRE STOOP AND DEEP ENOUGH TO COVER ENTIRE DEPTH OF FRONT YARD FROM BUILDING WALL TO SIDEWALK
Sep 23, 2024 V*-DOB VIOLATION - DISMISSED EGNCY-EMERGENCY NONE FULLY DEMOLISH THE BUILDING AND THE REAR STRUCTURE, AND GRADE SITE
Sep 18, 2024 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT 50FT OF TIGHT BOARD CONSTRUCTION FENCE AS FOLLOWS: 25FT AT THE SIDEWALK/FRONT LOT LINE AT EXP1 WITH RETURNS TO THE BUILDING COMEERS Q AT EXP 2 AND 4
Sep 18, 2024 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL OBSERVED EXP#1 BRICK FA ADE IN STATE OF DISREPAIR, BULGING, BRICKS SEPARATED/DISLODGED ,CRACKS AT MULTIPLE LOCATIONS AND IN DANGER TO COLLAPSE. LINTELS DISLODGED AND CORRODED. CHIMNEY AT EXP.2 IN STATE OF DISREPAIR W/DISPLACED STUCCO AND BRICKS, IN DANGER OF COLLAPSE.