Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
7 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 26, 2019 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 25, 2019 | V*-DOB VIOLATION - DISMISSED | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | INSTALL APPROX.15 LINEAR FT OF SWS AT FRONT(EXP#1,&WRAP THE SWS AROUND EXP#4 APPROX. 20 LINEAR FT TO COVER THE FRONT YARD(MAIN ENT.&WALKWAY) OF THE ADJACENT PROPERTY(705 DEKALB AVE)TO SAFEGUARD PUBLIC & PROPERTY NOTE SIDEWALK SHED SHALL PROJECT A MIN OF 10 FEET AF THE EXP 4 SIDE WALL TO PROVIDE PROTECTION OF THE MAIN |
| Apr 6, 2018 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Feb 24, 2017 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Apr 10, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Mar 18, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO CARRY OUT WORK IN ACCORDANCE WITH APPLICABLE LAWS & REGULAT IONS IN THAT CONSTRUCTION WORK IS BEING OTHER THAN A WEEKDAY BETWEEN 7AM & 6PM WITHOUT A VARIANCE AS REQUIRED BY SECTION 24-224 OF ADMINST- CODE WORK IN PROGRESS ON LINTELS AND BEAMS REMEDY:STOP ALL WORK,OBTAIN A VARIANCE OR WORK DURING DESIGNATED HOURS |
| Mar 18, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | NO GUARD RAILS NOTE:WORK IN PROGRESS UNDER PERMIT # 301972890,AT 2 & 3 FLOORS ON LENTILS AND BEAMS,WITH NO GUARD OR HAND RAILS PROVIDED FROM 1ST THRU 4TH FLOORS AT STAIRS AND LANDINGS REMEDY:STOP ALL WORK EXCEPT TO GUARD AND HAND RAILS,TO RETURN TO WORK CALL DEPT OF BUILDINGS @(718-802-3685) |