Brooklyn Dyker Heights
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 31, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | BOROUGH COMMISSIONER HAS ORDERED ALL WORK STOPPED UNDER PERMIT #B00896406-I1 ON 10/22/25. INTENT TO REVOKE APPROVAL AND PERMIT. STOP ALL WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE. |
| Dec 31, 2009 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Jul 14, 1999 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED:HAVING DEMOLISH THRU-OUT 1ST FLOOR APT. FRONT & REAR; PARTITION WALLS ERECTED WITH 2X3 METAL AND WOOD STUD CEILING. SECTION DEMO ELECTRICAL & PLUMBING DISCONNECTED. PARTI- TION WALLS ERECTED BLOCKING WINDOWS ON 1ST FLOOR. REMEDY: STOP ALL WORK IMMEDIATELY, FILE PLANS, OBTAIN PERMIT FOR RENOVATION WORK |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |