Brooklyn Greenpoint
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
6 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 28, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM 1 STRY MASONRY WALLS+WWOOD TRUSS&PURLINS ROOF SUSTAIN STRL DAMAGE ON 3/26/18 DUE TO TRUCK IMPACT BLDG.APPROX 50% OF FRONT WALL COLL APPROX 20FT OF ROOF FRAMING AT FRONT COLL.BEAR OF BEAM SUPPORT ROOF FRAMING IS COMPROMISED.REMEDY:OWN ENGAGE LIC PE&CONT'R EVAL BLDG&PERF REQ RPRS.FILE PERM FOR RPR WRK BY 4/15/18.START WRK BY 5/1/18 |
| Mar 27, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERG WRK.1 STRY MASONRY WALLS+WOOD TRUSS&PURLINS ROOF COMM BLDG SUSTAIN DAMAGE ON 3/26/18 DUE TO TRUCK IMPACT.APPROX 20'OF ROOF COLL AT FRONT.APPROX 50% OF FRONT WALL COLL.BEAR OF A BEAM SUPPORT ROOF FRAMING IS COMPROMISED.REMEDY:OWN IMMED SHORE AFFECT BEAM.REMOVE COLL ROOF FRAMING&BRIDGE CRANE.INSTALL TB FENCE@FRONT.FILE PERM BY 3/29/18 |
| Mar 26, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DAMAGED SUSTAINED TO FRONT ROOF AND FRONT FACADE DUE TO TRUCK DRIVING WITH TAIL GATE OPEN CAUSING FACADE TO COLLAPSE AND SINK OFF ROOF |
| Mar 26, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DAMAGE TO HAVE BEING SUSTAINED TO FRONT SIDE OF FACADE WALL AND RIGHT SIDE FRONT WALL. BEAM HOLDING ROOF IS COMPROMISED |
| Jan 1, 2012 | V-DOB VIOLATION - ACTIVE | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Mar 27, 2009 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |