NYC Building Report

Brooklyn East Williamsburg

656 Metropolitan Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

17 records

Date Status Type Summary
Oct 31, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTC W/COMMISSIONER'S ORDER CONTROL#348287 VIO#091125PI30102HZ DATED 09/11/25 REQUIRING OWNER TO PROVIDE A CORRECTIVE ACTION PLAN BY/ 09/23/25. AS OF 10/31/25 THE CAP DOCUMENTS WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER UNDER 348287 VIO#091125PI30102HZ TO PROVIDE A CORRECTIVE ACTION PLAN,SUBMIT ALL REQUIRED DOCUMENTS
Oct 31, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTC W/COMMISSIONER'S ORDER CONTROL#348286 VIO#091125PI30101HZ DATED 09/11/25 REQUIRING OWNER TO PROVIDE THE ANNUAL PARAPET OBSERVATION REPOT AS REQ'D FOR 2024.AS OF 10/31/25 THE ANNUAL PARAPET OBSERVATION REPORT WAS NOT REC'D BY 09/25/25. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#348286 VIO#091125PI30101HZ
Sep 11, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG IN CODE COMPLIANT MANNER-@ ROOFTOP LEVEL DISLODGE BRICKS & MISSING MORTAR @ BOTH CORNER EDGE OF THE BLDG. @ EXP2-3-4 MINOR SPALLING @ TOP COATING & BRICKS ALONG THE PARAPET WALLS. SUBMIT ANNUAL PARAPET OBSERVATION REPORT FOR YEAR 2024 ANT TO BE REC'D BY DOB NO LATER THAN SEPTEMBER 25, 2025
Sep 11, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL CORRECTIVE ACTION PLAN REQ'D-OBSVD @ FRONT FACADE ORNAMENTAL STOME WORK MISSING MORAR IN BTWN CRACKED STONE WORK DISLODGMENT OF STONE WORK @ 4TH&5TH FLRS REAR PARAPET WALL IN DISREPAIR,DISLODGEMENT BRACING AROND CHIMNERY. OWNER TO IMMED RETAIN REG DESING PROF TO EVAL THE ENTIRE BLDG & TO SUBMIT A CORRECTIVE ACTION PLAN BY 9/23/2025
Jan 6, 2021 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 2, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 2, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 2, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 2, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 2, 2020 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 30, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Oct 30, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 29, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 29, 2019 V*-DOB VIOLATION - DISMISSED AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 4, 1998 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Oct 31, 1994 V*-DOB VIOLATION - DISMISSED ES-ELECTRIC SIGNS NONE ES-ELECTRIC SIGNS NONE
Jun 23, 1993 VP*-VIOLATION UNSERVED ECB- DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL