Brooklyn Bedford-Stuyvesant (East)
653 Mac Donough Street, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
16 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 31, 2026 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER.NOTED AT THE T IME OF INSPECTION,I OBSERVED AT EXP1,DAMAGED ROOF CORNICE AND OPEN/EXP OSED MASONRY.AT EXP2,CRACK ON STONE AND MASONRY OBSERVED AT FIRST FL.A T EXP3,CRACK/STEP CRACK AND SPALLING STUCCO OBSERVED ON MULTIPLE LOCAT IONS.REMEDY:REPAIR AND/OR REPLACE |
| Nov 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO BROKEN FIRE ESCAPE TREAD AT EXPOSURE #3 NORTH ELEVATION AT FIRST FLOOR. REMEDY: IMMEDIATELY REPAIR BROKEN FIRE ESCAPE TREAD UNDER DIRECTION OF A LICENSED PROFESSIONAL |
| Nov 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. NOTE: AT THE TIME OF INSPECTION AT EXPOSURE 1 DAMAGED ROOF CORNICE AND BROKEN WINDOW PANE AT 2FL. EXP 2 CRACK STONE AT FIRST FLOOR EXP3, CRACK STUCCO IN WINDOW LINE. REMEDY: REPAIR AND/OR REPLACE |
| Oct 4, 2023 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 24, 2022 | V-DOB VIOLATION - ACTIVE | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Oct 21, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY W/COMMISSIONER'S ORDER#340936(082422FEU30301ZT)DATED 08/24/22,REQUIRING OWNER TO START REPAIRS UNDR PERMIT FOR THE FIRE DAMAGED ROOF & ROOF JOISTS.AS OF 10/21/22 THERE ARE NO JOBS FILES IN BIS/DOBNOW TO REPAIR THE BLDG.IMMED COMPLY W/COMMISSIONER'S ORDER# 340936(082422FEU30301ZT)TO REPAIR BLDG UNDER PERMIT |
| Aug 24, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM-FEW OPNING ON ROOF DUE TO FIREFGTNG OPS.INTRIOR DRYWALL,CEILING &JOISTS ON 3FL COMPRMISD.FEW ROOF JOISTS &BRCKS NEAR EXP1 WERE CHARRED NEW SISTR JOISTS INSTALLD W/O RPR DWGS FILED IN BIS/DOBNOW OWNR IMMED RTAIN NYSPE-EVAL ENTRE BLDG &PRPARE/FILE RPR DWGS.BLDG RPRD UNDR PRMT STRTNG 9/12/22.CMPLTD/SIGND OFF 10/3/22 |
| Jul 1, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FACADE AT EXPOSURE 1 IN DISREPAIR CONDITION BRICKS DISPLACING AND FALLING, REST OF BRICKS IN THIS AREA IN DANGER TO FUTURE COLLAPSE. |
| Jul 1, 2022 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLAINT. AT TIME OF INSPECTION DAMAGE OBSERVED TO HAVE BEEN SUSTAINED, ROOF PARTIALLY OPEN FOR ELEMENT, BEAMS AT FRONT SIDE CHARRED, EXCESSIVE WATER DAMAGE, WINDOW HAS BEEN REMOVED, CORNICE HAS BEEN REMOVED AND BRICKS FALLING TO ENTRYWAY AND PEDESTRIAN SIDEWALK DUE FIRE AND FIREFIGHTER OPERATION. |
| Jan 19, 2014 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING DUE TO CAR ACCIDENT |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 31, 2005 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 19, 2003 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |