Brooklyn East Flatbush-Erasmus
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 2, 2019 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Jul 24, 2018 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 7, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 24, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 24, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 24, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 4, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.DUE TO FIRE APPROX 90% OF ROOF COLLAPSED AND APPROX 60% OF EXP 2 MASONRY WALL COLLAPSED.SIGNIFICANT CRACKING AT EXP 1 MASONRY WALL. EXP 1&3 WALLS UNBRACED. REMEDY:OWNER TO IMMED ENGAGE DEMOLITION CONTRACTOR TO MOBILIZE AND BEGIN DEMOLITION FROM EXTERIOR OF THE BLDG ONLY.ALL WORK TO BE DONE UNDER THE DIRECTION OF A LIC PE WHO IS PRES |
| Nov 14, 1988 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |