Brooklyn Bushwick (East)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
18 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Sep 11, 2024 | V-DOB VIOLATION - ACTIVE | EGNCY-EMERGENCY NONE | FULLY DEMOLISH BUILDING. GRADE & FENCE SITE |
| Aug 26, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN DUE TO FIRE.ENTIRE ROOF DMGD W/APPRX 50%SEVERELY FIRE DMGD@REAR.ARRPX 3 3RDFL JOISTS CHARRED.2NDFL JOISTS FIRE DMGD@ EXP29(SOUTH)ENDS@REAR APPRX 8FT OF BLDG.APPRX50% OF EXP INDPNDNT IMMEDIATELY COMPLY WITH DOB VIOLATION #050224FEU30406BS |
| Jul 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.BLDG DAMAGD BY A 5-ALARM FIRE ON 5/1/24.ENT ROOF FIRE DMGD W/APPRX 50%SEVERELY DMGD@REAR.APPRX 3 OF THE 3RDFL JOISTS CHARRD APPRX 8FT OF 2NDFL JOISTS FIRE DMGD@EXP2(SOUTH)ENDS@REAR.IMMEDIATELY COMPLY WITH DOB VIOLATION #050224FEU30405BS |
| May 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN DUE TO FIRE.ENTIRE ROOF DMGD W/APPRX 50% SEVERELY FIRE DMGD@REAR.APPRX(3) 3RDFL JOISTS CHARRED.2NDFL JOISTS FIRE DMGD@ EXP29(SOUTH)ENDS@REAR APPRX 8FT OF BLDG.APPRX 50% OF EXP2 INDPNDNT.1 NYSPE STRCTRL ENG TO IMMED EVAL ENT BLDG&DSGN RPAIRS,2.FILE FOR RPAIRS BY 7/8/24,3.OBTN PRMTS&STRT WRK BY 7/22/2024 |
| May 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK.BLDG DAMAGED BY A 5-ALARM FIRE ON 5/1/24.ENT ROOF FIRE DMGD W/APPRX 50%SEVERELY DMGD@REAR.APPRX 3 OF THE 3RDFL JOISTS CHARRD APPRX 8FT OF 2NDFL JOISTS FIRE DMGD@EXP2(SOUTH)ENDS@REAR.1.IMMED INSTALL TEMP SHORNG ADJ EXP2WALL&TO SUPPORT ROOF FRAMNG FIRE DMGD PER PE,2.ALL WRK TO BE DRCTLY SPRVSD&DRCTD |
| May 2, 2024 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT 25 LINEAR FEET OF FENCE AT EXPOSURE 1 ALONG LOT LINE TO SAFEGUAR D THE PUBLIC AND PROPERTY |
| May 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERTINSPECTIONS @BUILDINGSNYC.GOV WITHIN 30 DAYS ADDRESSING ALL CONDITIONS WITH PLANS, PHOTOS RECOMMENDING TIME FRAME AND REPAIRS TO BE COMPLETED. |
| May 2, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. PREMISES SUFFERED SIGNIFICANT FIRE AND WATER DAMAGE ICLUDING CHARRED AND EXPOSED BEAMS ALONG WITH OPEN ROOF |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| Nov 2, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 19, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 19, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 19, 2003 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 27, 2001 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 7, 2000 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Aug 29, 1995 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |