Brooklyn Crown Heights (South)
616 Empire Boulevard, Brooklyn
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Dec 4, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN A BLDG IN A SAFE CONDITION.THE GARAGE IS LOCATD@ THE REAR OF THE LOT.THE GARAGE STRCTRE SFFRD FRM FAILURE TO MAINTAIN THE EXP2/3 WALL CRNR HAS A VERT CRCK W/SEPARATION.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 350227 (082524FEU30903ZT) |
| Dec 4, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN IN A BLDG IN A SAFE CONDITION.THE GARAGE LOCATED@ THE REAR OF THE THE LOT.THE EXPLOSION DMGD WAS LOCALIZED IN THE BSMNT NEAR EXP1&EXP1/4 CRNR.THE FRNT YRD BRCK PARAPETS WERE SEV DMGD.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,PREPARE/FILE RPAIR DWGS.BLDG TO BE RPAIRD UNDR PRMT STRTNG 9/8/25&CMPLTD |
| Aug 25, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.THE GARAGE LOCATED@THE REAR OF THE LOT THE EXPLOSION DMGD WAS LOCALIZED IN THE BSMNT NEAR EXP1&EXP1/4 CRNR THE FRNT YRD BRCK PARAPTS WERE SEVERELY DMGD BULGD OUTWRD,DISLOCATED.OWNR TO IMMED 1.RTAIN A NYSE&DOB REG CNTRCTR TO HAND DEMO THE FRNT YRD PARAPT TO A SAFE LVL.STRT WRK NO LATER THAN 8/26 |
| Aug 25, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN A BLDG IN A SAFE CONDITION.THE GARAGE LOCATED@THE REAR OF THE LOT.THE EXPLOSION DMG WAS LOCALIZED IN THE BSMNT NEAR EXP1 &EXP1/4 CRNR.THE FRNT YRD BRCK PARAPETS WERE SEV DMGD.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG,PREPARE/FILE RPAIR DWGS.BLDG TO BE RPAIRD UNDR PRMT STRTNG 9/8/25&CMPLTD |
| Aug 25, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN A BLDG IN A SAFE CONDITION.THE GARAGE IS LOCATD@ THE REAR OF THE LOT.THE GARAGE STRCTRE SFFRD FRM FAILURE TO MAINTAIN THE EXP2/3 WALL CRNR HAS A VERT CRCK W/SEPARATION.OWNR TO IMMED RTAIN NYSPE TO EVAL THE ENT BLDG DTRMINE THE STRCTRL STBILITY,&PREPARE/FILE RPAIR DWGS.BLDG TOBE RPAIRED |
| Aug 25, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | STRUCTURE RENDERED NON COMPLIANT AT TIME OF INSPECTION DAMAGE OBSERVED TOO HAVE BEEN SUSTAINED TO ENTIRE BUILDING DUE TO EXPLOSION IN CELLAR STRUCTURE MUST BE MAINTENANCE TO CODE COMPLIANT |
| Aug 25, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED THE AFTERMATH OF A CELLAR EXPLOSION THAT HAS COMPROMISED ENTI RE SSTRUCTURE WITH A BLOWN OUT WALL, BUCKLE FLOORS , MASONRY CRACKS AN D BUILDING SUBMIT ENGINNERS REPORT EVALUATING THE CITED CONDTIONSWITH PHOTOS AND THE TIME FRAME TO ERTINSPECTIONS@BUILDINGS.NYC.GOV |
| Aug 25, 2025 | V-DOB VIOLATION - ACTIVE | IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL | ERECT CONSTRUCTION FENCE 50 LINEAR FT AS FOLLOWS 30FT AT EXPOSURE 4 AND 20FT AT EXPOSURE 1 TO SAFEGUARD PUBLIC AND PROPERTY |