Brooklyn Park Slope
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
2 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 21, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | N1: REQUESTING AN ENGINEER REPORT DUE TO A CRACK ON MASONRY FACADE EXPOSURE#1 AND FLOOR SHIFTING AWAY APPROXIMATELY 2IN. AN ENGINEERING REPORT IS REQUIRED TO ASSESS AND RECTIFY THE STABILITY OF THE PROPERTY. |
| May 21, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING. OBSERVED VERTICAL CRACKS&STEPS CRACKS UNDER WINDOWSILL AT 3FL. ALSO SAW VERTICAL CRACK AT HALLWAY&APT WALLS. FLOOR AT APT4 MOVING AWAY FROM WALL APPROXIMATELY 2IN. UPON REVIEWING PRECONSTRUCTION SURVEY OBSERVED CRACKS ON FACADE EXP#1 & INCREASE OF CRACKS. ONGOING SHORING INSTALLATIONS AT EXP4 OF SITE (85 4 AVENUE). |