NYC Building Report

Brooklyn Cypress Hills

61 Crescent Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

51 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
Sep 23, 2024 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
Jun 30, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
Apr 25, 2023 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
Mar 16, 2020 V-DOB VIOLATION - ACTIVE HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
Jan 17, 2020 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Jan 17, 2020 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Oct 6, 2017 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM.WAREHOUSE TYPE STRUCT W/WOOD BOWSTRING TRUSS ROOF. JOB#321494744 TO RPR TRUSS WAS DISAPPROVED ON 6/23/17.NO SUBSEQUENT APPLICATION HAVE BEEN FILED W/DOB.YOU ARE ON NOTICE THAT A COLL MAY HAPPEN W/O RPRS REMEDY:RPR DWGS PREP BY LIC PE TO BE FILED W/DOB NO LATER 11/3/17.WRK UND PERM BEG BY 11/10/17.WRK BE SUBSTANT COMP&SIGN OFF BY 12/15/17
Jul 12, 2016 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FM.WAREHOUSE TYPE STRUCTURE W/A WOOD BOWSTRING TRUSS ROOF. WE RECEIVED AN ENGINEERING REPORT PREPARED BY OLD STRUCTURES ON 1/27/16.THE REPORT RECOMMENDS REPAIRS TO THE WOOD BOWSTRING TRUSS ROOF.REMEDY:REPAIR DWGS PREPARED BY A LIC PE ARE TO BE FILED W/THE DOB NO LATER THAN 9/12/16 WORK UNDER PERMIT TO BEGIN NO LATER THAN 9/14/16
Sep 24, 2015 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL 1 STORY INDUSTRIAL BLDG W/A WOOD BOWSTRING TRUSS ROOF. REMEDY: W/IN 60 DAYS OF DATE OF VIO OWNER TO ENGAGE NYS LIC PE EXP'D W/WOOD TRUSSES TO PROBE & EVAL STRUCTUAL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATION CALCULATIONS PROBES ETC & SUBMIT A REPORT ACCEPTABLE TO THE DEPT. REPR DRWGS TO BE FILED W THE DOB W/IN 45 DAYS AFTER THE INSPECTION
Aug 1, 2014 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONER'S ORDER. THE BUILDING HAS A WOOD BOWSTRING TRUSS. THE OFFICE ISSUED A VIOL/COMM ORDER TO SUBMIT ENGR REPORT ON THIS BUILDING. VIOLATION WAS ISSUED 5/12/14. NO REPORT WAS RECEIVED. REMEDY: COMPLY WITH THE COMMISSIONER'S ORDER
May 12, 2014 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL 61 CRESCENT ST.IS AN OCCP'D,1STORY,INDUSTRL BLDG/WOOD BOWSTRING TRUSS ROOF.WITHIN 60DAYS OF VIO,OWNER TO ENGAGE NYS LIC.PE EXPERNCD/WOOD TRUSS TO PROBE&EVALUATE STRUCTRL SOUNDNESS OF BOWSTRING USING FIELD VERIFICATIONS,CALCULATIONS,PROBES,ETC. EA.TRUSS&BEARINGS EVAL'D. ANY STRUCTURAL DEFICIENCIES SHORED.REPAIR DRWGS.FILED WITHIN 45 DAYSOF VIO
Mar 8, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Mar 8, 2001 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Feb 14, 2001 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. WORK NOTED: APPROX 75 - 2'X 2' SQUARES EXCAVATE & REFILLED WITH CONCRETE. PADS ARE SAID TO BE FOOTING PADS TO HOLD SUP PORT COLUMNS. NEW COLUMNS ARE NOT INSTALLED AT TIME OF INMSPECTION ALL WORK IN BASEMENT. STOP ALL WORK. REMEDY: OBTAIN PERMITS & APPROVAL FROM D.O.B. OFFICE BEFORE RETURNING TO WORK (718) 802 3686
Nov 24, 2000 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL