NYC Building Report

Brooklyn Bushwick (East)

60 Covert Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

5 records

Date Status Type Summary
Jul 5, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FIRE STATED AT REAR SIDE OF AT GROUND LEVEL NEXT DOOR (62 COVERT ST), ROOF IS OPEN WITH DAMAGE TO WALLS AND WOOD FRAMING ALONG WITH SMOKE AND WATER DAMAGE.
Jul 5, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL BUILDING NO LONGER CODE COMPLIANT DUE TO FIRE THAT STARTED AT GROUND LEVEL NEXT DOOR (62 COVERT ST) AND MOVED THROUGH BUILDING, ROOF IS OPEN WITH DAMAGE TO WALLS AND ROOF FRAMING, ALONG WITH SMOKE AND WATER DAMAGE ON ALL LEVELS. ---FULL VACATE---
Jun 11, 2001 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. WORK NOTED: A CANOPY WITH ALIMINUM FRAME 12'X18 X10' AT FRONT OF PREMISES. REMEDY: OBTAIN A PERMIT IF FEISABLE OR RESTORE TO PRIOR LEGAL CONDITION
Jun 3, 1999 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT. WORK NOTED: ERECTED AN AWNING OVER FRONT YARD APPROX 18'X 18'X 10 HIGH MADE OF METAL REMEDY: OBTAIN A PERMIT IF FEASIBLE OR REMOVE AWNING/CANOPY FROM FRONT OF PREMISES
Dec 8, 1997 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL