NYC Building Report

Brooklyn Canarsie

5975 Shore Parkway, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

224 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Jun 27, 2025 V*-DOB VIOLATION - DISMISSED P-PLUMBING NONE BASED ON LICENSE #001343 BEING INACTIVE STOP ALL PLUMBING WORK UNDER JOB #300664966 IMMEDIATELY.
Jun 27, 2025 V*-DOB VIOLATION - DISMISSED P-PLUMBING NONE BASED ON LICENSE #001343 BEING INACTIVE STOP ALL PLUMBING WORK UNDER JOB #300664993 IMMEDIATELY.
Jun 27, 2025 V*-DOB VIOLATION - DISMISSED P-PLUMBING NONE BASED ON LICENSE #001343 BEING INACTIVE STOP ALL PLUMBING WORK UNDER JOB #300665778 IMMEDIATELY.
Jun 27, 2025 V*-DOB VIOLATION - DISMISSED P-PLUMBING NONE BASED ON LICENSE #001343 BEING INACTIVE STOP ALL PLUMBING WORK UNDER JOB #300691712 IMMEDIATELY.
Jun 23, 2024 V*-DOB VIOLATION - DISMISSED EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023)
Apr 22, 2023 V*-DOB VIOLATION - DISMISSED EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022)
Aug 21, 2022 V*-DOB VIOLATION - DISMISSED EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021)
Feb 18, 2022 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 18, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 18, 2022 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 18, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 18, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 18, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 18, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 18, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 18, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 18, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 16, 2022 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 16, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 16, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Feb 16, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Jan 13, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Jan 13, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Jan 13, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Jan 12, 2022 V-DOB VIOLATION - ACTIVE FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Jan 11, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Jan 11, 2022 V*-DOB VIOLATION - DISMISSED FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED NYCHA CYCLE 9A UNSAFE REPORT FILED
Oct 10, 2021 V*-DOB VIOLATION - DISMISSED EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020)
Jun 29, 2020 V*-DOB VIOLATION - DISMISSED EARCX-FAILURE TO SUBMIT EER NONE FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
May 31, 2018 V*-DOB VIOLATION - DISMISSED FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017