NYC Building Report

Brooklyn Sunset Park (West)

5901 4 Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

7 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Jul 8, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAIL TO MAINTAIN-TWO LOCATIONS OF SPALLING STONE @2ND FLOOR LEVEL OF EXP1 OVER MAIN ENTRANCE.MULTIPLE LOCATIONS OF DETACHED &LOOSE STUCCO & DETERIORATED MORTAR & BRICKS @EXP2(REAR)WALL NYSPE STRCTRL ENGNR/QEWI RA-IMMED EVALU ENTIRE FACADE &DSGN RPRS.FILE BY8/5/22.OBTN PRMTS&STRT WRK 8/22/22.CMPLT 9/30/22
Jul 8, 2022 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FTM-BLDG SUFFRD FIRE ON 5/8/22 W/DMG TO 'L' LINE.FIRE DMG ON ROOF W/ OPN HOLES&WATER DMG LOWER FLRS OF 'L' LINE:MAIN STAIR &CORRIDOR MISSNG FIREPRFING THRUOUT.BLOCKD EGRESS@FIRE ESCAPE ACCSS @ MULTI LOC NYSRA/PE-IMMED EVALU ENTIRE BLDG &DSGN RPRS.FILE REPAIRS BY 8/8/22.OBT PRMTS&STRT WRK BY8/22/22.CMPLT/SIGN OFF 10/10/22
May 10, 2022 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL 35 LINEAR FEET OF SIDEWALK SHED TO BE INSTALL WITH 25 LINEAR FEET ON 4TH AVENUE AND RETURN 10 FEET ON 59 STREET TO SAFEGUARD THE PUBLIC
May 8, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL BUILDING RENDERED NON-COMPLAINT DUE TO FIRE.THE ROOR IS OPEN WITH SEVE RE DAMAGE TO APT. 4L. THERE IS SMOKE & WATER DAMAGE THROUGHOUT INCLUDI NG HALLWAY AND STAIRS. WINDOWS AND DOORS ARE BROKEN OR MISSING AT VARI OUS LOCATIONS THROIUGHTOUT
Apr 6, 2018 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
May 15, 2014 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT