Brooklyn Clinton Hill
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Sep 14, 2022 | V*-DOB VIOLATION - DISMISSED | COMPBLD-STRUCTURALLY COMPROMISED BUILDING NONE | FAILURE TO SUBMIT AN ACCEPTABLE INSPECTN RPT FOR STRUCTURALLY COMPROMISED BLDG. |
| Feb 4, 2020 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Feb 4, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | AT TIME OF INSPECTION, PREMISES VACANT OPEN AND UNGUARDED - DOOR AT PARLOR LEVEL UNLOCKED, WINDOWS UNSEALED AT PARLOR LEVEL, 1ST, 2ND AND 3RD FLOOR |
| Sep 17, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:3ST+B+C WOOD FRAMING OVER SOLID MASN PARTY WALLS@EXP2&4.THE BLDG INT STAIR IS SUPPT'D W/NON ENGINEERED SHOR@CELLAR LEVEL.THE SAME STAIR IS EXCESSIVELY LEAN FROM 2-3 FL.STUCCO CEILING PART COLLAP EXPOSING WOOD JOIST@SEVERAL LEVELS.OWNR TO ENGAGE NYSPE&ENDORSED CONTRCT EVAL WHOLE BLDG&OBT PRMTS FOR REPRS N/L/T 11/9/19.S/O REPR JOB N/L/T 3/2/20 |
| Sep 16, 2019 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO FIRE |