589 Flushing Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

12 records

Date Status Type Summary
Nov 8, 2019 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
May 31, 2018 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Apr 6, 2018 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
Feb 24, 2017 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT
Mar 3, 2015 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT
May 15, 2014 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT
Jan 15, 2014 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jan 15, 2014 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 1, 2013 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Jan 1, 2009 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 15, 2008 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO PROVIDE STANDPIPE SYSTEM IN READINESS AT ALL TIMES FOR FIRE DEPT. USE DURING CONSTRUCTION OPERATIONS IN ALL BUILDINGS EXCEEDING S IX STOREIES. NOTED:CONSTRUCTION OPERATIONS IN PROGRESSON SEVEN STORY BUILDING UNDER APPL #301499858 EP. 07/23/08 WITH INOPERABLE STANDPIPE SYSTEM.REMEDY:STOP ALL WORK UNTIL STANPIPE SYSTEM IS KEPT IN READINESS