Brooklyn South Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
12 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 8, 2019 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT |
| May 31, 2018 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| Apr 6, 2018 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT |
| Feb 24, 2017 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2015 INSPECTION REPORT |
| Mar 3, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2013 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Jan 15, 2014 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 15, 2014 | V-DOB VIOLATION - ACTIVE | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Jan 1, 2009 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 15, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROVIDE STANDPIPE SYSTEM IN READINESS AT ALL TIMES FOR FIRE DEPT. USE DURING CONSTRUCTION OPERATIONS IN ALL BUILDINGS EXCEEDING S IX STOREIES. NOTED:CONSTRUCTION OPERATIONS IN PROGRESSON SEVEN STORY BUILDING UNDER APPL #301499858 EP. 07/23/08 WITH INOPERABLE STANDPIPE SYSTEM.REMEDY:STOP ALL WORK UNTIL STANPIPE SYSTEM IS KEPT IN READINESS |