| Date | Status | Type | Summary |
|---|---|---|---|
| Apr 21, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO FIRE A SPECIAL INSPECTION STATEMENT OF RESPONSIBILITY (TR-1 ) PRIOR TO ISSUANCE AND PRIOR TO WORK UNDER SPECIAL INSPECTION REQUIRE MENT NOTED: TR-1 ONFILE IS FOR DESIGN APPLICANT ONLY MOST WORK REQUIRI NG SPECIAL INSPECTION IS COMPLETE INCLUDING STRUCURAL WORK NOT ON APPR OVED PLANSE REMEDY: STOP ALL WORK PROIVE PE REPORT FOR ALL WORK HERE |
| Apr 21, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS MASONRY BOILE R ROOM AT CELLAR EXISTING WOOD FLOOR JOISTS HAVE BEEN PRIMMED TO ACCOM MODATE CEILING INSTALLATION COMPLETE GUT DEMOLITIONOF ALL INTERIORS AT FLOOR 2 AND 3 AND PARTIAL STAIRS MASONRY WALL RESTORATION AT FLOOR 2 & 3 REMEDY: STOP ALL WORK AMEND PLANS PROVIDE PE REPORT OF SPECIAL INS |
| Mar 19, 2001 | VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT PERMIT. WORK NOTED: ERECTED A STEEL STRUCTURE APPROX 18' X 65'X 12'HIGH WALLS HAVE 1/8 INCH STEEL WELDED TOGETHER @ ROOF HAS METAL CONCRETE DECKING ALSO CONSTRUCTED 1/2 BATH. PRESENTLY FOR STOR- AGE FOR HARDWARE STORE REMEDY: OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITION |