Brooklyn East Williamsburg
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
13 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Feb 10, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EWO DUE TO SEVERE DETERIORATED SHELF ANGLE, WHERE SEPARATIONHAS STAR- TED & MOVEMENT OF SEPARATING PIECE WAS OBSERVED. SEPARATINGSECTION IS APPROX 3FT IN LENGTH & LOCATED DIRECTLY ABOVE THE MAINENTERANCE @ EXP 1 (E.ELEV).REMDY:IMMEDLY PROVIDE SAFETY MEAS TO SECURE/PROTECT THEPUB -LIC.MAKE IMMEDI REPAIR UNDER SUPERV OF LP. SECURE/REMOVE LOOSE MATERI |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Mar 31, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 14, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Mar 22, 2016 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Feb 19, 2014 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Oct 3, 2012 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 1, 2012 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2011 INSPECTION/TEST |
| Jun 27, 2012 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 27, 2012 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 27, 2012 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 28, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 15, 2011 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROTECT ADJOINING PROPERTY #56 BUSHWICK OF WATER INFULUATIO N GC TO PROVIDE REPORT AS TO THE METHOD OF WATER PROOFING PERFORMED TO DATE PROVIDE ENGINEERS REPORT INCLUSIVE OF MEANS & METHODS OF CONTREL LING WATER INFILTRATION TO ADJOINING PROPERTY BY WAY OF WATER PROOFING TYPE SYSTEM OR OTHER |