Brooklyn East New York (North)
HPD violations
Housing Maintenance Code violations are filed by tax lot (BBL 3-04061-0016), so they can include other buildings on the same lot.
3 records
| Date | Class | Status | Apartment | Summary |
|---|---|---|---|---|
| Mar 17, 2026 | B | NOV SENT OUT | 1STFLO | § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR AT CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 17, 2026 | A | NOV SENT OUT | 1STFLO | § 27-2026, 2027 HMC: PROPERLY REPAIR THE SOURCE AND ABATE THE EVIDENCE OF A WATER LEAK AT CEILING AND ALL WALLS IN THE PRIVATE HALLWAY LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |
| Mar 17, 2026 | A | VIOLATION DISMISSED | 1STFLO | § 27-2026 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE CONNECTION AT WASTE LINE AT BASIN SINK IN THE KITCHEN LOCATED AT APT 1STFLO, 1st STORY, 1st APARTMENT FROM NORTH AT EAST |