Brooklyn Bay Ridge
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
5 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Aug 5, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMMISSIONER'S ORDER 313366(053020CLLFA02RF) ISSUED ON 05/30/2020. AS OF 08/05/2021 OWNER HAS NOT COMPLIED WITH IMMEDIATE CURE ORDER. REMEDY: IMMED COMPLY WITH CODE AND COMMISSIONERS ORDERS |
| May 30, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCE. EXP 1 NORTH ELEVATION DISPLAYS SUBSTANIAL VERTICAL AND STEPPED CRACKS ON FACADE. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE, TAKE SAFETY MEAURES AND REPAIR DAMAGE AS PER 1RCNY 103-04 |
| Feb 25, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 4, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO COMPLY WITH COMM.ORDER #311233 ISSUED ON 11/14/2014 FOR EXPOSURE #1 DEFECTIVE FACADE WALL. NO PERMIT FOR REPAIR WORK HAS BEEN OBTAINED AS OF 12/04/2014. REMEDY: COMPLY W COMM. ORDER #311233 IMMEDIATELY |
| Nov 14, 2014 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN. BRICK FACADE WALL AT EXPOSURE #1 IS DEFECTIVE WIT H WIDE CRACKS. REMEDY: OWNER TO IMMEDIATELY HAVE LICENSED PE TO INSPEC T AND EVALUATE ENTIRE BUILDING, AND OBTAIN PERMIT FOR REPAIR. START RE PAIR WORK NO LATER THAN 12/01/2014 |