| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL LOW PRESSURE INSPECTION |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Feb 22, 2023 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9B TECHNICAL REPORT BY 2/21/2023 |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Sep 15, 2017 | V*-DOB VIOLATION - DISMISSED | HVIOS-NYCHA ELEV ANNUAL INSPECTION/TEST ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST |
| Sep 15, 2017 | V*-DOB VIOLATION - DISMISSED | HVIOS-NYCHA ELEV ANNUAL INSPECTION/TEST ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR-FAILURE TO FILE CATEGORY 1 2016 INSPECTION/TEST |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |
| Aug 30, 2013 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 7B TECHNICAL REPORT BY 08/21/2012 |