Brooklyn Brooklyn Heights
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
21 records
| Date | Status | Type | Summary |
|---|---|---|---|
| May 29, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BLDG IN A SAFE CONDITION/PARTIAL VACATE.2NDFL LAUNDRY ROOM@EXP 2/3 CRNR W/CONCRETE SLAB SEVERELY SPALLNG@UNDERSIDE OF SLAB&EXPOSED/CORRODED REBAR.TEMP SHORNG@UNDERSIDE OF 2NDFL PARTIALLY VACATE 2NDFL LAUNDRY ROOM UNTIL 2NDFL SLAB HAS BEEN PERM RPAIRD UNDR PRMT W/RPAIR JOB COMPLETED/SIGNED OFF |
| May 16, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | ADDITIONAL INFORMATION:EOR R.LEVINE SUBMITTD TO FEU ON5/4/24 AN INSUFFICIENT RPORT W/PHOTOS OF EMRGNCY SHORNG WRK.EMRGNCY SHORNG WRK DIDNT APPEAR TO BE CMPLTE,BASED ON LIMITED RPORT&PHOTOS.SBMT TO FEU BY END OF DAY ON 5/20/24,SGND&SEALD RPORT(S) OF ALL RECENT EMRGNCY SHORNG WRK WHICH BEGAN ON/ARND 5/9/24 |
| May 16, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.UNDERSIDE OF CELLAR,1ST,&2NDFL CONE SLABS SEVERELY SPALLD@VARIOUS LOCATIONS W/STEEL REINF.SEVERELYCORRODED& EXPSD.EXIST SHORNG WAS IN PLACE@SOME AREAS@SUBCELLAR&1STFL.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343281 (101323FEU30201PN)DATED 10/13/2023,TO CMPLTE EMRGNCY SHORING |
| Mar 15, 2024 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.UNDERSDE OF CONCRETE SLABS@CELLAR,1ST,2NDFLS WERE SEVERELY CELLAR, 1ST,2NDFLS@PENETRATIONS.EXISTNG SHORNG WAS INSTALLD@SUBCELLAR&1ST FLRS 2NDFL EXP3REAR SET BACK ROOF WAS DETERIORATD&SOFT.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER #343282(101323FEU30202PN)TO PERMANENTLY REPAIR BLDG UNDER PERMIT |
| Dec 13, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 15, 2023 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 14, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.UNDERSIDE CELLAR,1ST,&2NDFL CONE SLABS SEVERELY SPALLD@VARIOUS LOCATIONS W/STEEL REINF.SEVERELY CORRODED&EXPOSD.EXIST SHORNG WAS IN PLACE@SOME AREAS@SUBCELLARS&1STFL.IMMEDIATELY COMPLY WITH COMMISSIONER'S ORDER 343281 (101323FEU30201PN)DATED OCTOBER 13, 2023.CONT EMER SHORNG WRK |
| Oct 13, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FTM.UNDERSIDE OF CNCRETE SLABS@CELLAR,1ST,2NDFLS WERE SEVERELY CELLAR, 1ST,2NDFLS@PENETRATIONS.EXISTING SHORNG WAS INSTALLD@SUBCELLAR&1ST FLRS.2NDFL EXP3REAR SET BACK ROOF WAS DETERIORATD&SOFT.OWNR TO RTAIN NYS PE TO EVAL ENT BLDG&PREPARE/FILE.RPAIR DRWNGS W/DOB.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG 11/27/23 |
| Oct 13, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.UNDERSIDE OF CELLAR,1ST,&2NDFL CONE SLABS SEVERELY SPALLD@VARIOUS LOCATIONS W/STEEL REINF.SEVERELY CORRODED & EXPOSD.EXIST SHORNG WAS IN PLACE@SOME AREAS@SUBCELLAR&1STFL.OWNR TO IMMED RTAIN NYS PE&GC REGISTRD W/DOB TO 1.INSTALL SHORNG&SAFEGUARD AREAS AS REQ'D,2.NYS PE TO PROVIDE FULL TIME,CONT ONSITE SUPERVISION |
| Oct 13, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM.UNDERSIDE OF CNCRETE SLABS@CELLAR,1ST,2NDFLS WERE SEVERELY CELLAR, 1ST,2NDFLS@PENETRATIONS.EXISTING SHORNG WAS INSTALLD@SUBCELLAR&1ST FLRS.2NDFL EXP3REAR SET BACK ROOF WAS DETERIORATD&SOFT.OWNR TO RTAIN NYS PE TO EVAL ENT BLDG&PREPARE/FILE.RPAIR DRWNGS W/DOB.BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG 11/27/23 |
| Oct 13, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER.UNDERSIDE OF CELLAR,1ST,&2NDFL CONE SLABS SEVERELY SPALLD@VARIOUS LOCATIONS W/STEEL REINF.SEVERELY CORRODED & EXPOSD.EXIST SHORNG WAS IN PLACE@SOME AREAS@SUBCELLAR&1STFL.OWNR TO IMMED RTAIN NYS PE&GC REGISTRD W/DOB TO 1.INSTALL SHORNG&SAFEGUARD AREAS AS REQ'D,2.NYS PE TO PROVIDE FULL TIME,CONT ONSITE SUPERVISION |
| Sep 19, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILD IN CODE COMPLAINT MANNER. NOTE, CONCRETE CINDER SLAB AT SUB CELLAR, CELLAR AND 1ST CEILING IS FLAKING, CRACKED AND SECTION MISSING, EXPOSING STEEL WHICH IS RUSHING IN VARIOUS LOCATION. THERE IS ALSO A NUMBER OF OPENINGS IN THE FLOOR SLAB VARIOUS LOCATION ON ALL LEVELS. |
| Jul 3, 2023 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL COLLAPSE AT SUB CELLAR ELECTRICAL ROOM. OSERVED ON-GOING LEAK AT SUBCELLAR CONTRIBUTING TO DETERIORATION OF STRUCTURAL MEMBERS IN VARIOUS LOCATIONS. SPALLING CONCRETE, RUSTED REDAR & PARTIAL CONCR ETE. OWNER TO HIRE NYSPE TO SUBMIT REPORT/CONST ENF @ BLDGS..NYC GOV W/IN 30 DAYS..ADDRESSING ALL CONDITIONS W/PLANS,PHOTOS, |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Aug 2, 2021 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 17, 2020 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 21, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jan 1, 2014 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |