NYC Building Report

Brooklyn Windsor Terrace-South Slope

55 Havemeyer Street, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Dec 1, 2023 V*-DOB VIOLATION - DISMISSED EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Feb 2, 2023 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Dec 1, 2022 V-DOB VIOLATION - ACTIVE EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Nov 2, 2022 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Aug 2, 2022 V*-DOB VIOLATION - DISMISSED BENCH-FAILURE TO BENCHMARK NONE FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4
Aug 31, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ED AMENDMENTS REMEDY; TAPPED AND PRIMED, STOP ALL WORK IMMEDIATELY REVISE AMEND DRAWINGS
Aug 25, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV AL AMENDMENTS AT TIME OF INSPECTION I DID OBSERVE WORK CHANGED FROM EXISTING PLANS 1ST FLOOR 3 SETS SPIRAL STAIRS REPLACING CONVERTIONAL S TAIRS 3RD FLOOR BATHROOMS EXPANDED CLOSES ADDED 3RD & 4TH SKYLIGHT PLA CEMENT REMEDY: CONFORM TO APPROVED DOCUMENTS OR AMENDMENTS
Aug 25, 2009 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK DOES NOT CONFORM TO APPROVED CONSTRUCTION DOCUMENTS AND/OR APPROV ED AMENDMENTS AT TIME OF INSPECTION I DID OBSERVE IN BASEMENT FOUNDATI ON WALLS & UNDERPINNING NOT SHOWN IN APPROVED PLANS REMEDY: