Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
10 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Mar 27, 2023 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | THERE ARE 2 MONOPOLE SIGN STRUCTURES,APPROX 200 FT HIGH ON LOT.OWNRTO IMMED ENGAGE A NYS LIC PE EXP W/MONOPOLE SIGN STRCTRE TO INSPECT THE MONOP FORENSICENG@BUILDNGS.NYC.GOV |
| Dec 23, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO CORRECT UNLAWFUL ARTERIAL DOUBLE FACED MONOPOLE SIGN STRUCT URE THAT EXCEEDS THE HEIGHT & SURFACE AREA LIMITS IN M3-1 ZONE ACCESSO RY SIGN & STRUCTURE PERMITS SG300924338 SG300924365 ALT300924294 WERE DISCONTINUED PER ZR 52-61 AS SIGN STRUCTURE WAS VACANT OR USED TO DISP LAY ADVERTISING FOR MORE THAN 2 YEARS |
| Jan 29, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | 2 MONOPOLE SIGN STRUCTURE APPROX 200FT HIGH ON LOT.OWNER TO ENGAGE IMEEDIATELY LICENSED PE EXPERIENCED WITH MONOPOLE SIGN STRUCTURE TO INSPECT THE MONOPOLE SIGN STRUCTURE ,INCLUDING VISUAL INSPECTION, ENGINEERING & MATERIALS TESTING EVALUATION OF ALL THE COMPONENTS OFTHE SIGN STRUCTURE & FOUNDATION ETC |
| Dec 7, 2013 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | (28.502.4) UNREG |
| Dec 7, 2013 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | (28-205.4)UNREG |
| Dec 31, 2009 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED |
| Jul 22, 2008 | VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | OUTDOOR ADVERTISING COMPANY SIGN ON DISPLAY STRUCTURE W/O A PERMIT SIGN COPY ON WEST SIDE " HONDA ECONOMICAL EMOTIONAL RATIONAL" |
| Mar 29, 2001 | V*-DOB VIOLATION - DISMISSED | Z-ZONING NONE | Z-ZONING NONE |
| Mar 29, 2001 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 27, 1999 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |