NYC Building Report

Brooklyn Crown Heights (North)

542 St Marks Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Dec 1, 2024 V*-DOB VIOLATION - DISMISSED EGRADE-FAILURE TO POST ENERGY GRADE/SCORE NONE FAILURE TO DISPLAY ENERGY EFFICIENCY SCORE AND ENERGY EFFICIENCY GRADE AS PER ADCODE SEC. 28-309.12.3
Jan 14, 2020 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
May 31, 2018 V-DOB VIOLATION - ACTIVE FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017
Feb 26, 2016 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jul 30, 2014 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Jun 24, 2013 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Nov 10, 2010 V*-DOB VIOLATION - Resolved E-ELEVATOR ELEVATORREQUIRED E-ELEVATOR ELEVATORREQUIRED
Sep 13, 2007 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO ADEQUATELY PROTECT THE SIDES OF AN EXCAVATION CARRIED TO A DEPTH GREATER THAN 5' FEET NOTED: UPON INSPECTION AN ACTIVE SITE EXCAV TION WORK IN PROGRESS. EXCAV IS APPROX 10'-13' DEEP WITH A SHEER CUT IN.SOIL NO SHEETING, SHORING WERE PROVIDED. FOUNDATION, NB PARTIALLY IN PLACE. REMEDY: SW, CONFORM TO CODE, CALL 718-802-3675