NYC Building Report

Brooklyn Borough Park

5322 18 Avenue, Brooklyn

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-05479-0049), so they can include other buildings on the same lot.

7 records

Date Class Status Apartment Summary
Mar 17, 2025 B VIOLATION DISMISSED Not available § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE FURNACE CEMENT AROUND BREACHING AROUND FLUE PIPE TO WALL AT BOILER ROOM
Jul 13, 2023 B VIOLATION CLOSED Not available § 27-2005 ADMIN. CODE: PROPERLY SECURE THE LOOSE NORTH SIDE HANDRAIL AT STOOP, 1st STORY
Jul 13, 2023 B VIOLATION CLOSED Not available § 27-2005 ADMIN. CODE: PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE MORTAR AND CEMENT 1ST 2ND AND 3RD TREADS UP AT STOOP, 1st STORY
Feb 18, 2015 B VIOLATION CLOSED 1 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILING IN THE PRIVATE HALLWAY LOCATED AT APT 1 UPPER LEVEL, 2nd STORY
Feb 18, 2015 B VIOLATION CLOSED 1 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR CEILINGS (TOTAL 2 BATHS) IN THE BATHROOM LOCATED AT APT 1 UPPER LEVEL, 2nd STORY
Feb 18, 2015 B VIOLATION CLOSED 1 § 27-2005 ADMIN. CODE: REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN UNIFORM COLOR WALLS AND CEILING IN THE BATHROOM LOCATED AT APT 1, 1st STORY
Feb 18, 2015 B VIOLATION CLOSED 1 § 27-2026 ADMIN. CODE: REPAIR THE FLUSHING APPARATUS AND MAINTAIN SAME SO AS TO FLUSH EFFECTIVELY THE WATER CLOSET IN THE BATHROOM LOCATED AT APT 1, 1st STORY