NYC Building Report

Brooklyn Borough Park

5311 Fort Hamilton Parkway, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

4 records

Date Status Type Summary
Jun 12, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO COMPLY WITH COMMISSIONER'S ORDER:DOB VIOLATION # 041326CFEU31202AK (CONTROL #350548)WHICH REQUIRES OWNER ENGAGE A NYSPE &REGISTERED CONTRACTOR TO EVAL THE ENTIRE BLDG&REPAIR UNDR PERMIT,W/ PERMITS FILED FOR BY 5/27/26.AS OF 6/12/26.NO REPAIR PERMITS HAVE BEEN FILED FOR.COMPLY W/COMMISSIONERS ORDER:DOB VIO#041326CFEU31202AK
Apr 13, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER.AT TIME OF INSPCTN,OBSRVD BLDG TO BE IN A STATE OF DISRPAIR DUE TO FIRE W/ROOF CHARRD&OPEN,WNDWS OUT&BOARDED UP,FIRE WATER&SMOKE DMG THROUGHOUT.HEAVY DEBRIS LOAD THROUGHOUT BLDG.OWNR TO ENGAGE NYSPE&LIC'D CNTRCTR TO ERECT TGHTBRD CNSTRCTN FNCE@EXP1&3.FENCE KEYS TO BE GIVEN TO FDNY BATTALION 40
Apr 13, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN.AT TIME OF INSPCTN,OBSRVD BLDG TO BE IN A STATE OF DISRPAIR DUE TO FIRE W/ROOF CHARRED&OPEN,WNDWS OUT&BOARDED UP,FIRE WATER&SMOKE DMG THROUGHOUT.HEAVY DEBRIS LOAD THROUGHOUT BLDG.OWNR TO ENGAGE NYSPE&REG CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT.FILE FOR RPAIRS BY 5/27/26.SGN OFF CNTRCTR TO EVAL THE ENT BLDG&RPAIR UNDR PRMT
Apr 12, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLIANT DUE TO FIRE. AT THE TIME OF INSPECTION OBSERVED EXTENSIVE FIRE,WATER AND SMOKE DAMAGE THROUGHOUT PREMISES. ALSO OBSERVED WINDOWS REMOVED AND LARGE SECTIONS OF THE ROOF OPEN EXPOSING PREMISES TO THE ELEMENTS.