NYC Building Report

Brooklyn Sunset Park (Central)

528 40 Street, Brooklyn

HPD violations

Housing Maintenance Code violations are filed by tax lot (BBL 3-00917-0018), so they can include other buildings on the same lot.

13 records

Date Class Status Apartment Summary
Apr 6, 2021 A VIOLATION DISMISSED Not available (A) § HMC:FILE ANNUAL BEDBUG REPORT IN ACCORDANCE WITH HPD RULE AS DESCRIBED ON THE BACK OF THIS NOTICE OF VIOLATION OR AS DESCRIBED ON HPDS WEBSITE, WWW.NYC.GOV\HPD, SEARCH BED BUGS.
Mar 22, 2019 A NOV SENT OUT Not available § 26-1103 ADMIN. CODE: POST AND MAINTAIN A PROPER NOTICE ON WALL OF THE ENTRANCE STORY IN ENGLISH AND SPANISH ON THE AVAILABILITY OF THE AGENCYS HOUSING INFORMATION GUIDE. A SAMPLE NOTICE CAN BE FOUND AT WWW.NYC.GOV/HPD. AT PUBLIC HALL, 1st STORY
Mar 22, 2019 A NOV SENT OUT Not available § 27-2005 HMC: POST, IN A FORM APPROVED BY THE COMMISSIONER, AND MAINTAIN A NOTICE IN A COMMON AREA OF THE BUILDING REGARDING THE PROCEDURES THAT SHOULD BE FOLLOWED WHEN A GAS LEAK IS SUSPECTED
Mar 22, 2019 B NOV SENT OUT 2F § 27-2045 ADM CODE REPAIR OR REPLACE THE SMOKE DETECTOR DEFECTIVE IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Mar 22, 2019 B NOV SENT OUT 2F § 27-2046.1 HMC: REPAIR OR REPLACE THE CARBON MONOXIDE DETECTING DEVICE(S). MISSING IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Mar 22, 2019 C NOTICE OF ISSUANCE SENT TO TENANT 2F HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Mar 22, 2019 A NOV SENT OUT 2F § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE FOYER LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Mar 22, 2019 A NOV SENT OUT 2F § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE WOOD WINDOW SILL AT EAST WALL IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Mar 22, 2019 A NOV SENT OUT 2F § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL IN THE KITCHEN LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Mar 22, 2019 A NOV SENT OUT 2F § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE NORTH WALL IN THE 2nd ROOM FROM NORTH AT EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Mar 22, 2019 A NOV SENT OUT 2F § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING AND NORTH WALL IN THE 1st ROOM FROM NORTH AT WEST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Mar 22, 2019 A NOV SENT OUT 2F § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING IN THE BATHROOM LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH
Mar 22, 2019 A NOV SENT OUT 2F § 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT THE CEILING ,SOUTH AND EAST WALL IN THE 1st ROOM FROM NORTH AT EAST LOCATED AT APT 2F, 2nd STORY, 1st APARTMENT FROM WEST AT NORTH