Brooklyn Carroll Gardens-Cobble Hill-Gowanus-Red Hook
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
46 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 20, 2023 | V-DOB VIOLATION - ACTIVE | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION |
| Feb 16, 2022 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 5, 2022 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 22, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Nov 24, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 22, 2021 | V*-DOB VIOLATION - DISMISSED | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | CYCLE 9B UNSAFE REPORT FILED |
| Oct 13, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Oct 1, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER-OBSERVED BY FACADE INSPECTOR ON 10/01/2021 THERE ARE CRACKED/SPALLING BALCONY SLABS AT BOTH BALCONY LINES OF EXP #1 (COURT ST)DUE TO THESE CONDITIONS BALCONIES AT APT'S 3A,3C,4A,4C,5A, 5C,6A,6C ARE TO BE VACATED. LOCKING DEVICES ARE TO BE INSTALLED TO RESTRICT TENANT ACCESS. REMEDY:VACTE BALCONIES 3A,3C,4A,4C,5A,5C,6A,6C |
| Oct 1, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES OBSERVED CRACKED/SPALLING BALCONY SLABS AT EXPOSURE #1 WEST ELEVATION THE BALCONY AT APT #6C IS ORDERED TO BE VACATED. REMEDY: MAINTAIN EXTERIOR BUILING FACADE AND APPURTENANCES. PROVIDE SAFETY MEASURES AND REPAIR DAMAGED FACADE AS PER 1RCNY 103-04 |
| Oct 1, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES OBSERVED CRACKED/SPALLING BALCONY SLABS AT EXPOSURE #1 WEST ELEVATION THE BALCONY AT APT #6A IS ORDERED TO BE VACATED. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. PROVIDE SAFETY MEASURES AND REPAIR DAMAGED FACADE AS PER 1RCNY 103-04 |
| Oct 1, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES OBSEVED CRACKED/SPALLING BALCNY SLABS AT EXP #1 WEST ELEVATION. THE BALCONY AT APT #5C IS ORDERED TO BE VACATED. REMEDY: MAINTAIN EXTERIOR BUILDING AND APPURTENANCES. PROVIDE SAFETY MEASURES AND REPAIR DAMAGED FACADE AS PER 1RCNY 103-04 |
| Oct 1, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES OBSERVED CRACKED/SPALLING BALCONY SLABS AT EXP #1 WEST ELEVATION THE BALCIN AT APT #5A IS ORDERED TO BE VACATED. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. PROVIDE SAFEY MEASURES AND REPAIR DMAMGED FACADE AS PER 1RCNY 103-04 |
| Oct 1, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES OBSERVED CRACKED/SPALLING BALCONY SLABS AT EXP #1 WEST ELEVATION. THE BALCONY AT APT #4C IS ORDERED TO BE VACATED. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. PROVIDE SAFETY MEASURES AND REPAIR DAMAGED FACADE AS PER 1RCNY 103-04 |
| Oct 1, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES OBSERVED CRACKED/SPALLING BALCONY SLABS AT EXP #1 WEST ELEVATION. THE BALCONY AT APT #4A IS ORDERED TO BE VACATED. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENACES. PROVIDE SAFETY MEASURES AND REPAIR DAMAGED FACADE AS PER 1RCNY 103-04 |
| Oct 1, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILUER TO MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES OBSERVED CREACKED/SPALLING BALCONY SLABS AT EXPOSURE #1 WEST ELEVATION THE BALCONY AT APT 3C IS ORDERED TO BE VACATED. REMEDY: MAINTAIN EXTERIOR BUILDING FACADE AND APPURTENANCES. PROVIDE SAFETY MEASURES AND REPAIR DAMAGED FACADE AS PER 1RCNY 103-04 |
| Oct 1, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM EXTERIOR BUILDING FACADE AND APPURTENANCES. OBSERVED CRACKED/ SPALLING BALCONY SLABS AT EXP #1 WEST ELEVATION. THE BALCONY AT APT #3A IS ORDERED TO BE VACATED. REMEDY: MAINTIAN EXTERIOR BUILDING FACADE AND APPURTENACES. PROVIDE SAFETY MEASURES AND REPAIR DAMAGED FACADE AS PER 1RCNY 103-04 |
| Oct 1, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | PARTIAL VACATE ORDER. OBERVED 10/1/2021 BY FACADE INSPECTOR. THERE ARE CRACKED/SPALLING BALCONY SLABS ON BOTH BALCONY LINES @ EXP 1(COURT ST) DUE TO THESE CONDITIONS BOTH BALCONY LINES AT EXP 1(COURT ST) ARE TO BE VACATED ENTIRELY. LOCKING DEVICES ARE TO BE INSTALLED TO RESTRICT TENANT ACCESS. REMEDY: VACATE BOTH BALCONY LINES AT EXP 1 ENTIRELY |
| Sep 15, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 1, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 21, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 21, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Apr 30, 2021 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | EMERGENCY WORK ORDER DUE TO UNSTABLE LEANING STEEL OVERHEAD FRAMING AT GROUND LEVEL AT EXPOSURE 1(COURT ST). REMEDY: IMMED RETAIN A NYS LIC ENGINEER TO PROVIDE A SAFETY AND REPAAIR PLAN FOR NOTED CONDITION. PROVIDED PLANS AND REPORT TO THE FACADE UNIT BY 5/14/2021 ANY SHORING AND STABILIZATION WORK REQUIRES A LIC ENG'R TO BE PRESENT |
| Apr 10, 2018 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jun 10, 2015 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST |
| Jun 10, 2015 | V*-DOB VIOLATION - DISMISSED | EVCAT1-ELEVATOR ANNUAL INSPECTION / TEST ELEVATORREQUIRED | VIOLATION ISSUED TO ELEVATOR-FAILURE TO FILE CATEGORY 1 2014 INSPECTION/TEST |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| May 15, 2014 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2012 INSPECTION REPORT |
| Apr 30, 2013 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Mar 1, 2013 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2011 INSPECTION REPORT |
| Oct 29, 2010 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Jun 5, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Apr 7, 2009 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROVIDE APPROVED/ACCEPTED PLANS AT JOB SITE AT TIME OF INSP ECTION REMEDY: PROVIDE PLANS |
| Sep 19, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 9, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO PROVIDE PROTECTION OF SIDES OF EXCAVATION, @ TIME OF INSPECTION.CONTRACTOR FAILED TO PROVIDE SUPPORT OF EXCAVATION, SHORING OR A STABLE ANGLE OF REPOSE OF 45% OR FLATTER @ EXP 3 & 4 WHERE EX ARE APPRO 10 TO 15 FT DEEP,CONTRACTOR INSTALLED PARTIAL FOUND WALL REMEDY:SWO-PROVIDE PROTECTION AS REQUIRED BY THIS SECTION CALL SEP/EX |
| Apr 7, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Jan 3, 2008 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 17, 2004 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | DUE TO CIRCUMSTANCE BEYOND CONTROL DUE TO EXCAVATION FROM ADJACENT BLDG HAS BEEN CRACKED BY EXTERIOR BRICKWORK AND UNDERMINED BY EXCAVATION FRONT WALL 1" TO 3" INCHES OUT OF PLUMB BY FRONT AND SIDEWALLS .SOUTHWEST CORNER OF BLDG AND REAR NOTED ERXCESS WATER SUBMIT ENGINEERS REPORT FOR STRUCTURAL STABILITY & PROVIDE SHEET |
| May 23, 2001 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT: WORK NOTED: A METAL STRUCTURE ERECTED (APPROX 8'X 16'X 7') ON THE REAR OF LOT REMEDY: OBTAIN A PERMIT OR REMOVE STRUCTURE |
| Dec 24, 1992 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Dec 21, 1990 | VP*-VIOLATION UNSERVED ECB- DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |