NYC Building Report

Brooklyn Windsor Terrace-South Slope

51 Caton Place, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

14 records

Date Status Type Summary
Jan 22, 2025 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 30, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL THE ADJACENT CONSTRUCTION SITE CAUSED CRACKS INSIDE TO THE EXPOSURE 4 SIDE OF THE PREMISE RENDERING THE PREMISE NON-COMPLIANT
Mar 30, 2022 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 11, 2019 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Jun 22, 2018 V-DOB VIOLATION - ACTIVE UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
May 11, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL COMPLY WITH VACATE
Mar 7, 2018 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Feb 8, 2018 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERG WRK.ROOF HAS PART COLL AT FRONT OF BLDG.ROOFING MEMBRANE IN DISREPAIR AT ROOF&INADEQ COVERED.WATER LEAKING INSIDE BLDG.REMEDY:OWN IMMED ENGAGE NYS PROF ENG&CONT'R TO SHORE THE ROOF.SHORING WORK TO BE CONT SUPERV OF A PE. FILING TO SHORING TO BE DONE W/2 BUS DAYS OF COMMENCEMENT OF WORK
Dec 19, 2017 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTM BLDG.ROOF HAS PART COLL FOR AN AREA AT FRONT OF BLDG.ROOFING MEMBRANE IS IN DISREPAIR AT APPROX 80% OF THE ROOF&INADEQUATELY COVER W/TARPS.WATER IS LEAKING INSIDE BLDG.REMEDY:OWN ENGAGE NYS PROF ENG EVAL BLDG.PERM FOR REPAIR JOB TO BE OBTAIN NO LATER 1/15/18.SIGN OFF OF REPAIR JOB TO BE NO LATER THAN 3/15/18
Mar 8, 2017 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Sep 24, 2014 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
May 22, 2001 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Jul 10, 2000 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL HAZARDOUS
Jun 30, 2000 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL HAZARDOUS