Brooklyn Park Slope
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
246 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION |
| Jun 20, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION |
| Apr 25, 2023 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Dec 22, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 22, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 22, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 22, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Dec 22, 2021 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 2, 2020 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 16, 2020 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION |
| Mar 16, 2020 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION |
| Mar 16, 2020 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION |
| Mar 16, 2020 | V*-DOB VIOLATION - DISMISSED | HBLVIO-HIGH PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED - FAILURE TO FILE 2017 EXTERNAL HIGH PRESSURE BOILER INSPECTION |
| Dec 9, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Dec 6, 2019 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST TST |
| Feb 16, 2019 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Nov 26, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 26, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 26, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 26, 2018 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 15, 2018 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER PLUMBING LAA #340630393 WITHIN 15 DAYS. STOP ALL PLUMBING WORK IMMEDIATELY EXCEPT TO MAKE SITE SAFE |
| Nov 15, 2018 | V*-DOB VIOLATION - DISMISSED | P-PLUMBING NONE | THE DOB INTENDS TO REVOKE ALL APPROVALS AND PERMITS UNDER LAA #340616943 WITHIN 15 DAYS. STOP ALL PLUMBING WORK EXCEPT TO MAKE SITE SAFE |
| Mar 27, 2018 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2017) |
| Nov 29, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 29, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Nov 28, 2017 | V*-DOB VIOLATION - Resolved | E-ELEVATOR ELEVATORREQUIRED | E-ELEVATOR ELEVATORREQUIRED |
| Aug 2, 2017 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| May 2, 2017 | V*-DOB VIOLATION - DISMISSED | BENCH-FAILURE TO BENCHMARK NONE | FAILURE TO FILE BENCHMARKING REPORT OF ENERGY USE AS PER AD. CODE SEC. 28-309.4 |
| Feb 16, 2017 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2016 |
| Feb 14, 2017 | V*-DOB VIOLATION - DISMISSED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED | FISP-FACADE SAFETY PROGRAM FACADE REQUIRED |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACC1-(OTHER BLDGS TYPES) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |