Oct 24, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ADDITIONAL INFORMATION/EXP1&4 WALLS SEVERELY CRACKED,BULGING, COMPROMISED.TEMP SHORNG/BRACNG INSTALLED UNDER EMERGENCY WORK ORDER OWNR TO RTAIN NYSPE TO SBMT WEEKLY MONITORNG PLAN W/CRACK/OPTICAL MONITORNG PLAN TO FEU.SBMT PROPOSD MONITORNG PLAN
Jul 2, 2025 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL IMMEDIATELY BRACED THE EXTERIOR EXPOSURE 1 WALL ALONG 51 STREET AT 2ND FLOOR TO ROOF (APPROX 50 LF IN WIDTH) AND THE EXPOSURE 4 WALL ALONG 5 AVE AT 2ND FLOOR TO ROOF (APPROX 38 LF IN WIDTH)
May 22, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL 1STFL CAST IRON COLUMN SDWLK VAULT@EXP1(5TH AVE)W/STEEL BEAM CORRODED/ COMPROMISED.FRONT APTS@2NDFL (1A)&3RDL (2A)COMPROMISED,INCLUDING 1STFL COMMERCIAL SPACE.IMMED COMPLY W/COMMISSIONER'S ORDER #342068 (050525FEU30702PN) REQUIRED STABILIZATION WRK CONTINUE DAILY UNDER NYSE SPRVSN
May 5, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL CAST IRON COLUMN AT 1/4 CORNER LEANING.EXP1 MASONRY WALL CRCKD THRUOUT @1STFL TO 3RDFL LOAD BEARNG EXP1 WALL CMPROMISD@1ST THRU 3RDFLRS@APT1A (2NDFL)&2A(3RDFL) SDLK VAULT@EXP4ALNG 5THAVE CMPRMSD.OWNR TO IMMED RTAIN RTAIN GC TO 1.IMMED INSTLL/EXTND SDWLK SHED ALNG EXP1@51ST ALNG FULL WIDTH OF BLDG,2.INSTLL CNSTRCTN FNCE
May 5, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL 1STFL CAST IRON COLUMN SDWLK VAULT@EXP1(5TH AVE)W/1STFL STEEL BEAM CORRODED/COMPROMISED.FRONT APTS@2NDFL(1A)&3RDFL (2A)COMPROMISED, INCLUDNG 1STFL COMMERCIAL SPACE.OWNR TO RTAIN NYSPE&GC REG W/DOB TO IMMED 1.TEMP SHORE BLDG FRM CELLAR TO ROOF@APTS 1A&2A,&BELOW 2NDFL EXP 1&4 SPANDRELS
May 5, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL PARTIAL VACATE/FAILURE TO MAINTAIN BLDG IN SAFE CONDITION.EXP1.4 CAST IRON COLUMN LEANING@1STFL EXP1 LOAD BEARNG WALL CRCKDTHROUGHOUT 1ST THRY 3RDFL.EXP4 SDWLK VAULT CMPRMSD W/STEEL BEAM@1STFL.OWNR TO RTAIN NYSPE TO EVAL ENT BLDG&FILE RPAIR DWGS W/DOB BLDG TO BE PERM RPAIRD UNDR PRMT STRTNG BY 6/9/25&CMPLTD/SGN
Apr 18, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURAL STABILITY INSPECTION AT THE CELLAR & 1ST FLOOR COMMERCIAL S PACE. PLEASE SUBMIT ENGINNERS REPORT BY MONDAY APRIL 21ST TO INCLUDE D ETAILS OF THE SHORING & A LETTER OF OMISSION OWNER TO HIRE NYSPE TO SUBMIT REPORT TO ERT INSPECTIONS@BUILDINGS.NYC GOV BY MONDAY APRIL 21ST ADDRESSING CONDITION WITH PLANS & PHOTOS
Apr 18, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL STRUCTURAL STABILITY INSPECTION AT THE CELLAR AND 1ST FLOOR COMMERCIA L SPACE LEVEL-AS PER FEU, IT IS RECOMMENDE TO BE PARTIALLY VACATED DUE TO A STRUCTURAL STABILITY PARTIAL VACATE FOR FLOOR 1 & CELLAR
May 22, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDR.PER ENGNEER REPORT BY TT DATED 5/17/23,EXP1 BRCK CRCKD OUT&BULGNG OUT @1ST THRU 3RD FLRS NEAR EXP1/4 CRNRBRCK PIER @ CELLAR SETTLED APPRX4 IN. PORTIONS OF BLDG UNSFE&REQUIRES.OWNR TO RTAIN NYS PE&GC TO IMMED:1.INTALL SDWALK SHED ALONG EXP1@51,AS REQ'D, 2.INSTLL BLDG SHORNG/BRACNG,AS REQ'D UND
May 11, 2023 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL ON 51 STREET (NORTH EAST FACADE) THERE ARE MAJOR STEP CRACKS AT FIRST FLOOR AND SECOND TO THIRD FLOORS.
May 4, 1998 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Aug 16, 1993 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED