NYC Building Report

Brooklyn Bedford-Stuyvesant (West)

499 Franklin Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

9 records

Date Status Type Summary
Aug 28, 2026 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. NOTED AT THE TIME OF INSPECTION, OBSERVED CORNICE LEANING AND DAMAGED, SPALLED/ SPALLING WINDOW. (EXP 1). REMEDY: REPAIR AND/OR REPLACE
Nov 17, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO DAMAGED/DISPLACED CORNICE ON EXPOSURE 1 REMEDY: IMMEDIATELY STABILIZED/REPAIR THE DISPLACED CORNICE AND MAINTAIN ADEQUATE SAFETY MEASURES
Nov 17, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. OBSERVED DAMAGED/LEANING CORNICE, AND SPALLED/SPALLING WINDOW SILLS ON EXPOSURE 1. REMEDY: REPAIR AND OR REPLACE
Nov 17, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL EMERGENCY WORK ORDER DUE TO DAMAGED/DISPLACED CORNICE ON EXPOSURE 1 REMEDY: IMMEDIATELY STABALIZE/REPAIR THE DISPLACED CORNICE AND MAINTAIN ADEQUATE SAFETY MEASURES
Nov 3, 2025 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL MAKE ALL NECESSARY REPAIRS TO THE SIDEWALK SHED AND ENSURE THE AREA IS MADE SAFE FOR PEDESTRIAN USE
Oct 30, 2025 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL SEAL ALL FIRE DAMAGED OPENINGS TO SAFEGUARD THE PUBLIC AND PROPERTY
Jun 23, 2021 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Mar 26, 2021 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL ERECT ALONG EXP#1 ABOVE THE AWNING APPROX 17 LINEAR FT OF SWS TO COVER THE ENTIRE WIDTH OF THE FRONT YARD, EXTEND APPROXIMATELY 5 FEET TO ADJACENT PROPERTY 501 FRANKLIN AVENUE, EXTEND APPROXIMATELY 6 FEET TO THE ADJACENT PROPERTY 497 FRANKLIN AVENUE TO COVER THE ENTRY WAY AND EXTEND APPROX.15FT IN DEPTH TOCOVER THE YARDS/STOOPS & PUBLIC SIDEWALK
Mar 25, 2021 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION, OBSERVED AT FRONT OF BUILDING CORNICE SAGGING AND NOT SECURED TO FACADE, ALSO PEELING AND MISSING PIECES OF ORNAMENTAL WINDOW TRIM.