NYC Building Report

Brooklyn Bedford-Stuyvesant (East)

493-495 Monroe St, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

11 records

Date Status Type Summary
Nov 14, 2025 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION
Oct 22, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FTC W/COMMISSIONER'S ORDER CONTROL#341569 VIO#062525PI30302SB DATED 06/25/25 REQUIRING OWNER TO PROV A CORRECTIVE ACTION PLAN BY 07/25/25& START BLDG REPRS UNDER PERMIT BY 08/25/25&COMPL/SIGNED OFF BY 09/25/25 AS OF 10/22/25 A CAP & EVID OF COMPL WORK WAS NOT REC'D. IMMED COMPLY W/COMMISSIONER'S ORDER CONTROL#341569 VIO#062525PI30302SB TO PROV CAP
Jun 27, 2025 V-DOB VIOLATION - ACTIVE IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL INSTALL A SIDEWALK SHED ALONG THE FULL WIDTH OF EXPOSURE 1 APPROX 50 FEET. ADDITIONALLY 5 FEET EXTENSION ON EITHER SIDE OF EXPOSURE 1 ABOUT 60 LINEAR FEET IN TOTAL
Jun 25, 2025 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL CORRECTION ACTION PLAN REQ'D. OBSVD @ EXO1 MASONRY BULGING/STEP CRACKS @ MULT LOCATIONS, DETERIORATED LINTELS & DETERIORATED MORTAR JOINTS @ EXP1/2 CORNER OBSVD MASONRY CRACKS & AT EXP1/4 OBSVD MULT MASONRY CRACKS. OWNER TO IMMED RETAIN REG DESIGN PROF TO EVAL ENTIRE BLDG AND SUBMIT CORRECTIVE ACTION PLAN TO PROACTIVEINSP@BUILDINGS.NYC.GOV
Sep 23, 2024 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL LOW PRESSURE INSPECTION
Jan 25, 2012 V-DOB VIOLATION - ACTIVE AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Jan 6, 2006 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 31, 2005 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Feb 7, 2000 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED