Brooklyn Sunset Park (Central)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
4 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 22, 2025 | V-DOB VIOLATION - ACTIVE | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED A CRACKED AND DAMAGED BALCONY AT REAR OF PROPERTY. BALCONY WAS DAMAGED FROM ONGOING CONSTRUCTION OPERATIONS AT ADJACENT PROPERTY (4908 8TH AVENUE). UNLICENSED USE OF EXCAVATOR LEAD TO DAMAGE AT REAR OF BALCONY. |
| Mar 9, 2011 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Mar 25, 2008 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK FAILURE TO CONFORM TO APPROVED PLANS NOTED: APPROVED SHOP DRAWINGS DO NOT SHOW ALL SOLDIER PILES THAT ARE INSTALLED AT REAR NO SPECS OR DESK FOR WALL BRACING THAT IS INSTALLED AT 4912 8 AVE NO ELEVATIONS FOR FOOTINGS AND FOUNDATION AT 4918 8 AVE AND NEW BUILDING UNDER PINNING NOT SIGNED OFF ON TR-1 REMEDY: STOP ALL WORK REF DRAWING |
| Nov 27, 2007 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | STOP ALL WORK FAILURE TO PROVIDE PLANS OR SHOP DRAWINGS ON SITE FOR UNDERPINNING SHEETING AND SHORING ETC NOTED: AT TIME OF INSPECTION AN ACTIVE EXCAVATION SITE EXCAVATION FOR UNDERPINNING AND NO PLANS ON SITE (DETAILS) EXCAVATION FOR TEST APPROX 8' TO 10' DEEP AND NOT PROTE CTION PROVIDED REMEDY: STOP ALL WORK EXCEPT TO MAKE SAFE BACKFILL |