NYC Building Report

Brooklyn Park Slope

489 4 Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

5 records

Date Status Type Summary
Dec 22, 2022 V-DOB VIOLATION - ACTIVE C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN CODE COMPLIANT MANNER. AT TIME OF INSPECTION OBSERVED AT EXPOSURE #2 1ST FLOOR MASONRY WALL BULGING OUTWARD SECTIONS OF MASONRY BRICKWORK LOOSE, MISSING MORTAR AT JOINTS. NOTE: EARTH/SOIL HAVE BEEN PLACED AT AREA WHERE BULGING LOCATED.
Sep 10, 1999 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK WITHUT A PERMIT. WORK NOTED: APPROX 6'X20' ONE STORY EXTENTION AT FRONT. (2) RELOCATION OF FRONT ENTRANCE DOOR. (3) NEW MASONARY BLOCK WALL 1ST STORY NORTH. A BRICK VENEEM ON INTIRE FRONT (5) NEW METAL STEPS AND PLATFORM AT 2ND FLOOR. REMEDY: OBTAIN A PERMIT. IF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION
Jan 5, 1998 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL C-CONSTRUCTION OTHER OPTIONAL
Dec 29, 1997 VW*-VIOLATION - WORK W/O PERMIT DISMISSED C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT NEW BRICK AND CEMENT BLOCK FACADE INSTALLED IN T HE NORTH LOT AND UPPER FL REMEDY; OBTAIN PERMITS AND APPROVALS IF FEASIBLE OR RESTORE PREMISES T O PRIOR LEGAL CONDITION
Dec 29, 1997 VW-VIOLATION WORK WITHOUT PERMIT - ACTIVE C-CONSTRUCTION OTHER OPTIONAL WORK WITHOUT A PERMIT WORK NOTED NEW BRICK AND MEMENT BLOCK FACADE INSTALLED AT THE NORTH LOT LINE UPPER FL REMEDY: OBTAIN PERMIT AND APPROVALS OF FEASIBLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION