NYC Building Report

Brooklyn Flatbush (West)-Ditmas Park-Parkville

485 Coney Island Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

10 records

Date Status Type Summary
Mar 27, 2024 V*-DOB VIOLATION - DISMISSED IMEGNCY-IMMEDIATE EMERGENCY ANYTHINGOPTIONAL SEAL ALL OPENINGS TO PREVENT UNAUTHORIZED ENTRY AND TO SECURE THE STRUCTURE
Mar 27, 2024 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL STRUCTURE RENDERED NON COMPLAINT. AT TIME OF INSPECTION OBSERVED EXP#1 WALL PARTIALLY, STORE FRONT AND ROLL DOWN GATE DAMAGED INTERIOR WALLS AND CEILING DAMAGED, BUILDING EGRESS/INGRESS COMPROMISED DUE TO CAR STRIKE BUILDING. VACATE ENTIRE BUILDING.
Mar 27, 2024 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL AT TIME OF INSPECTION OBSERVED EXP#1 WALL PARTIALLY, STORE FRONT AND ROLL DOWN GATE DAMAGED INTERIOR WALLS AND CEILING DAMAGED, BUILDING EGRESS/INGRESS COMPROMISED DUE TO CAR STRIKE BUILDING.
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Jun 20, 2023 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL LOW PRESSURE INSPECTION
Nov 8, 2019 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Nov 8, 2019 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2017 INSPECTION REPORT
Dec 13, 2011 V-DOB VIOLATION - ACTIVE LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Jan 1, 2009 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jan 3, 2008 V-DOB VIOLATION - ACTIVE LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED