Brooklyn Bedford-Stuyvesant (West)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
131 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Nov 14, 2025 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL LOW PRESSURE INSPECTION |
| Jun 23, 2024 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2023) |
| Apr 22, 2023 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2022) |
| Aug 21, 2022 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2021) |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V-DOB VIOLATION - ACTIVE | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 22, 2022 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 9A TECHNICAL REPORT BY 02/21/2022 |
| Feb 18, 2022 | V-DOB VIOLATION - ACTIVE | FISPHAZ-HAZARDOUS CONDITION (FACADE) FACADE REQUIRED | NYCHA CYCLE 04 UNSAFE REPORT FILED |
| Oct 10, 2021 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 - MULTIPLE YEARS (2020) |
| Jun 29, 2020 | V*-DOB VIOLATION - DISMISSED | EARCX-FAILURE TO SUBMIT EER NONE | FAILURE TO SUBMIT AN EER PER AD. CODE SEC. 28-308.4 IN 2019 |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| Sep 6, 2019 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2017 CAT 1 INSP/TST |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| May 31, 2018 | V*-DOB VIOLATION - DISMISSED | FISPNRF-NO REPORT AND / OR LATE FILING (FACADE) FACADE REQUIRED | FAILED TO FILE FISP CYCLE 8A TECHNICAL REPORT BY 02/21/2017 |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jan 26, 2018 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2016 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jan 3, 2017 | V*-DOB VIOLATION - DISMISSED | ACH1-(NYCHA) - ELEVATOR AFFIRMATION OF CORRECTION ELEVATORREQUIRED | VIO ISSUED TO NYCHA ELEVATOR - FAIL TO CORRECT DEFECTS ON 2015 CAT 1 INSP/TST |
| Jun 1, 2016 | V*-DOB VIOLATION - DISMISSED | HVCAT5-NYCHA ELEVATOR PERIODIC INSPECTION/TEST ELEVATORREQUIRED | FAILURE TO PERFORM CATEGORY 5 INSPECTION |
| Sep 27, 2013 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |
| Sep 27, 2013 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |
| Sep 27, 2013 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |
| Sep 27, 2013 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |
| Sep 27, 2013 | V*-DOB VIOLATION - DISMISSED | LL11/98-LOCAL LAW 11/98 - FACADE FACADE OPTIONAL | CYCLE 7 UNSAFE REPORT FILED |