Brooklyn Sunset Park (Central)
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
25 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jul 13, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jul 13, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 1, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jun 1, 2016 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Feb 10, 2016 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | UNLAWFUL ACTS. FAILURE TO COMPLY W/COMMISSIONERS ORDER. ORDER CONTROL# 327561 REQUIRES OWNER TO START WORK UNDER PERMIT NO LATER THAN 9/11/15 NO PERMIT FILED ACCORDING TO BIS OM 2/10/16. REMEDY: IMMED COMPLY WITH COMMISSIONERS ORDER CONTROL#327561 |
| Oct 1, 2015 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2014 INSPECTION REPORT |
| Sep 23, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 23, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 23, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Sep 23, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Aug 24, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FM THE EXISTING SHOREFRONT SUPPORT STEEL BEAM ALONG 60TH STREET IS SEVERELY DETERIORATED W/VISIBLE HOLES IN THE WEB. THE BEAM IS @ THE GRD FL FRAMING.THE BEAM IS INEFFECTIVE DUE T/STATE OF DETERIORATION OWNER IS T/HIRE A LIC NYSPE TO DESIGN A PERMANENT RPR FOR THE SEVERELY DETERIORATED SHRFRNT OBT PERMIT BY 9/4/15 ALL WRK TO COMM BY 9/11/15 |
| Aug 24, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK W/OUT PERMIT. BENEATH THE 60TH STREET SIDEWALK EXTENDING FROM THE FACE OF THE BLDG TO THE RUBBLE FOUNDATION WALL THE WOOD SHORING THAT WAS INSTALLED WAS INSTALLED W/OUT A PERMIT. THE OWNER IS TO HIRE A LIC PE TO EVALUATE & FILE THE ASSICIATED REPAIRS BENEATH THE SIDEWALK BY 9/4/15 |
| May 20, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FILED A CERTIFICATE, FORM, STATEMENT CONTAINING MATERIALS OF FALSE STA TEMENTS, NOTED UNDER APPLICATION #320883807 ON PW-1 PAGE 5 SECTION 26, CHECKED NO FOR BUILDING OCCUPIED DURING CONSTRUCTION FOR MORE UNITS, ALSO CHECKED NO FOR BUILDING OCCUPIED BY RENT CONTROLLED/STABILIZED TE NANTS,A T TIME OF INSPECTION BUILDING OCCUPIED WITH RENT STABILIZED |
| May 20, 2015 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FILED A CERTIFICATE, FORM, STATEMENT CONTAINING MATERIALS OF FALSE STA TEMENTS, NOTED UNDER APPLICATION #320883807 ON PW-1 PAGE 5 SECTION 26, CHECKED NO FOR BUILDING OCCUPIED DURING CONSTRUCTION FOR MORE UNITS, ALSO CHECKED NO FOR BUILDING OCCUPIED BY RENT CONTROLLED/STABILIZED TE NANTS,A T TIME OF INSPECTION BUILDING OCCUPIED WITH RENT STABILIZED |
| May 20, 2015 | V*-DOB VIOLATION - DISMISSED | AEUHAZ1-FAIL TO CERTIFY CLASS 1 NONE | FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION |
| Jan 6, 2006 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Mar 19, 2003 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Apr 20, 1999 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. WORK NOTED: A/C UNIT CEILING MOUNTED AND METAL VENT PILE INSTALLED THROUGH WALL AT FIRST FLOOR AND EXTEND TO ROOF. 2 EXHAUST UNIT FANS HAVE BEEN INSTALLED; ALSO BRICK WALL CUT THROUGH TO INSTALL VENT AND EXHAUST TO EXTERIOR. REMEDY: OBTAIN A PERMIT IF FEAS BLE OR RESTORE PREMISES TO PRIOR LEGAL CONDITION |
| Mar 16, 1999 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| May 4, 1998 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Feb 9, 1998 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT. EXHAUST DUCT HAS BEEN CONSTRUCTED FROM 1ST FLOOR TO ROOF LEVEL ON THE SOUTHEAST CORNER OF THE BUILDING (ALONG 5TH AVE) REMEDY: OBTAIN PERMIT |
| Dec 17, 1997 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | WORK WITHOUT A PERMIT EXHAUST DUCT ERECTED IN THE SOUTH SIDE OF THE BUILDING (ALONG 5TH AVE) FROM FIRST FLOOR TO ROOF LEVEL REMEDY: OBTAIN PERMIT |
| Dec 3, 1997 | VW*-VIOLATION - WORK W/O PERMIT DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |
| Sep 16, 1997 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jan 2, 1992 | VPW*-VIOLATION UNSERVED ECB-WORK WITHOUT PERMIT-DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | C-CONSTRUCTION OTHER OPTIONAL |