Brooklyn Park Slope
DOB violations
Department of Buildings violations attached to this BIN or tax lot.
8 records
| Date | Status | Type | Summary |
|---|---|---|---|
| Jun 30, 2023 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION |
| Dec 16, 2020 | V*-DOB VIOLATION - DISMISSED | EGNCY-EMERGENCY NONE | DEMOLISH THE REAR EXTENSION COMPRISING THE COLLAPSED ROOF, THE EXP 3 / REAR WALL, AND ANY ANY REMNANT EXTENSION EXP 2 AND EXP 4 WALLS LEFT STANDING AFTER THE REAR EXTENSION REMOVED. SEAL UP THE GROUND FLOOR OPENING INTO THE MAIN 3 STORY BLDG WITH NON COMBUSTIBLE MATERIAL &SEAL UP THE 2ND FL. REAR DOOR & WINDOWS THAT LEAD ONTO THE REAR EXT ROOF |
| Jun 12, 2020 | V*-DOB VIOLATION - DISMISSED | UB-UNSAFE BUILDINGS NONE | UB-UNSAFE BUILDINGS NONE |
| Jun 1, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER,/VACATE ENTIRE PREMISES |
| May 28, 2020 | V*-DOB VIOLATION - DISMISSED | C-CONSTRUCTION OTHER OPTIONAL | FTM:BLDG HAD PRTY WALLS AT EXP 2&4.APPRX 80% OF 1 STRY ROOF@REAR EXT'N COLLAP INTO 1 FLOOR WITH REMAIN 4' &ROOF @EXP3 DETERIOR/SAGGING.1 STRY EXP3 WALL INADEQU BRACED.EXP3 FIRE ESC&2FL DOOR EGRESS LEADING TO COLP ROOF COMPROMISED.OWNER TO RETAIN NYSPE TO EVALUATE ENTIRE BUILDING AND PREPARE REPR DRWGS.BLDG TO BE REPR'D START BY 7/20/20& CMPL BY 9/30/20 |
| Dec 13, 2011 | V*-DOB VIOLATION - DISMISSED | LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED | VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT |
| Mar 26, 2002 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |
| Jul 25, 1994 | V*-DOB VIOLATION - DISMISSED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED | LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED |