NYC Building Report

Brooklyn Park Slope

474 5 Avenue, Brooklyn

DOB violations

Department of Buildings violations attached to this BIN or tax lot.

8 records

Date Status Type Summary
Jun 30, 2023 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL LOW PRESSURE INSPECTION
Dec 16, 2020 V*-DOB VIOLATION - DISMISSED EGNCY-EMERGENCY NONE DEMOLISH THE REAR EXTENSION COMPRISING THE COLLAPSED ROOF, THE EXP 3 / REAR WALL, AND ANY ANY REMNANT EXTENSION EXP 2 AND EXP 4 WALLS LEFT STANDING AFTER THE REAR EXTENSION REMOVED. SEAL UP THE GROUND FLOOR OPENING INTO THE MAIN 3 STORY BLDG WITH NON COMBUSTIBLE MATERIAL &SEAL UP THE 2ND FL. REAR DOOR & WINDOWS THAT LEAD ONTO THE REAR EXT ROOF
Jun 12, 2020 V*-DOB VIOLATION - DISMISSED UB-UNSAFE BUILDINGS NONE UB-UNSAFE BUILDINGS NONE
Jun 1, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FAILURE TO MAINTAIN BUILDING IN A CODE COMPLAINT MANNER,/VACATE ENTIRE PREMISES
May 28, 2020 V*-DOB VIOLATION - DISMISSED C-CONSTRUCTION OTHER OPTIONAL FTM:BLDG HAD PRTY WALLS AT EXP 2&4.APPRX 80% OF 1 STRY ROOF@REAR EXT'N COLLAP INTO 1 FLOOR WITH REMAIN 4' &ROOF @EXP3 DETERIOR/SAGGING.1 STRY EXP3 WALL INADEQU BRACED.EXP3 FIRE ESC&2FL DOOR EGRESS LEADING TO COLP ROOF COMPROMISED.OWNER TO RETAIN NYSPE TO EVALUATE ENTIRE BUILDING AND PREPARE REPR DRWGS.BLDG TO BE REPR'D START BY 7/20/20& CMPL BY 9/30/20
Dec 13, 2011 V*-DOB VIOLATION - DISMISSED LBLVIO-LOW PRESSURE BOILER BOILER REQUIRED VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2010 INSPECTION REPORT
Mar 26, 2002 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED
Jul 25, 1994 V*-DOB VIOLATION - DISMISSED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED LL6291-LOCAL LAW 62/91 - BOILERS BOILER REQUIRED